My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-09-1996 - S-P Testing, Inc. re: septic
Orono
>
Property Files
>
Street Address
>
W
>
Woodhill Road
>
315 Woodhill Rd - 02-117-23-13-0008
>
Septic
>
11-09-1996 - S-P Testing, Inc. re: septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:06:26 PM
Creation date
2/27/2020 9:01:41 AM
Metadata
Fields
Template:
x Address Old
House Number
315
Street Name
Woodhill
Street Type
Road
Address
315 Woodhill Rd
Document Type
Septic
PIN
0211723130008
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S-P TESTING INC. Steven B. Schirmers • MPCA Cert.No. 627 <br /> 951 Katydid Lane NE • St. Michael, MN 55376 • (612) 497-3566 <br /> FAX (612)-497-5011 <br /> State License #394 <br /> November 9, 1996 <br /> John Pruden t,L5'e <br /> 315 Woodhill Rd. Lot 1 <br /> Orono, Henn. Co., MN <br /> kJ' <br /> ((`v <br /> This site has an existing conforming mound system for a 5 bedroom home built in 1991. <br /> The supply line to the east was not connected to the system. To meet the requirement <br /> for a 6 bedroom home, 12' would need to be added to the existing rock bed to the west. <br /> The future site will also need a pressurized mound system. <br /> This on-site sewage treatment system is designed for a Type 1, 4 bedroom home & 2 <br /> bedroom guest home = 6 bedrooms, in accordance with the Minnesota Pollution Control <br /> Agency Chapter 7080 and local ordinances. <br /> The soils on this site are SCS soils mapped - KkC - Kilkenny loam. The seasonally <br /> saturated soils were located at 22" to 34" (mottled soil). The bottom of the treatment <br /> area must be located at least 3' above the saturated soils. <br /> The soils at a depth of 12" have a percolation rate averaging 3.7 mpi. <br /> A pumping chamber is installed to lift the effluent to the treatment area. The power <br /> supply and switches must be located outside the manhole and pumping chamber in a <br /> weather proof enclosure. A warning device must be installed with a light and sound <br /> device, this is in case of a pump failure. <br /> The manifold and supply line pipe must have back drainage to the pumping chamber. <br /> The distribution pipes shall have their ends capped. Be sure the rock and sand fill <br /> material are clean. The sod layer below the entire mounded area must be turned over, <br /> just break up the sod, be sure not to over work. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.