Laserfiche WebLink
r � <br /> S-P TES TING, INC. <br /> 951 KATYDID LANE <br /> ST. MIGHAEL, MN 55376 <br /> 497-3566 <br /> Steven B. Schirmers <br /> November 27, 1989 <br /> Woodhill Country Club <br /> 2 Acre Sub-Division <br /> Woodhill Ridge, Outlot B R:a <br /> • <br /> Orono, Henn. Co. , MN <br /> This system is Designed for a Type 1, four bedroom home and in accordance <br /> with the Minnesota Pollution Control Agency Chapter 7080 and local <br /> ordinances . <br /> The soils on this site are typical of SCS soils mapped - KkC - Kilkenny <br /> loam. A seasonally high water table was located at 60" , 66" , 74" , <br /> 78" & 90" , (mottled soil ) . The bottom of each trench must be located <br /> at least 3 ' above the seasonally high water table. A standard trench <br /> system can be installed. <br /> The soils at a depth of 24" & 30" in Percolation test holes #1 through <br /> #5 have a percolation rate averaging 24 .0 min/inch and are adequate <br /> for treating septic effluent. Percolation test hole #6 failed at <br /> 240 . 0 min/inch and the system can not be located in this area. <br /> A pumping chamber will need to be installed to lift the effluent to the <br /> treatment area. <br /> The power supply and switches must be located outside the manhole and <br /> pumping chamber in a weather proof enclosure. A warning device must be <br /> installed with a light and sound device, this is in case of a pump failure. <br /> (Mercury floats are a good method) . The supply line pipe must have <br /> back drainage to the pumping chamber. <br /> All neighboring wells are located more than 100 ' away from the proposed <br /> treatment area. <br /> Keep all heavy equipment off of the proposed treatment area before and <br /> after construction as much as possible. The treatment area should be <br /> marked off before construction. <br /> With proper installation and maintenance, this system should have no <br /> problem in treating septic effluent effectively. <br /> Recommend to pump the septic tank every year if there is only 1 tank <br /> & every 2 years if there are 2 tanks . <br /> Soil and Percolation Tests <br /> Septic System Design Steven B. Schirmers 10l <br /> SBS/ds <br />