My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
VOIDED - 2014-01243
Orono
>
Property Files
>
Street Address
>
W
>
Willow Drive South
>
1000 Willow Drive South - 10-117-23-21-0004
>
Permits/Inspections
>
VOIDED - 2014-01243
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:20:27 PM
Creation date
2/25/2020 2:16:03 PM
Metadata
Fields
Template:
x Address Old
House Number
1000
Street Name
Willow
Street Type
Drive
Street Direction
South
Address
1000 Willow Drive South
Document Type
Permits/Inspections
PIN
1011723210004
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNIVERSITY <br /> OF MINNESOTA OSTP Field Evaluation Form <br /> 1.Contact Information Project ID: v 05.13.14 <br /> Property Owner/Client Lindsay and Anna Klombies Client Phone Number: <br /> Address Same <br /> Date Weather Conditions <br /> 2. Utility and Structure Information <br /> Utility Locations Identified ❑Gopher ate One GII x E::= ❑Any Private utilities <br /> Property Lines ❑Determined and Approved W Client Client's Approval(initial) <br /> ❑Determined but not Approved <br /> ❑Approximate <br /> ❑property Lines Surveyed <br /> Locate and Verify(see Site Evaluation map) <br /> ❑Existing Buildings ❑Improvements ❑Easements ❑Setbacks <br /> 3. Site Information <br /> Percent Slope 8 Slope Direction <br /> Landscape Position shoulder Slope Shape <br /> Vegetation type(s) grass <br /> Evidence of cut,fill,compacted or disturbed areas ❑Yes No <br /> Discuss the flooding or run-on potential of site <br /> Identify benchmarks and elevations(Site Evaluation Map)Existing septic tank lid <br /> Proposed soil treatment area adequately protected 0 Yes ❑No <br /> 4. General Soils Information <br /> Original soils El Yes ❑No <br /> Type of observation ❑Soil probe Q Soll Boring ❑Soll pit <br /> Number of soil observations 3 <br /> Soil observations were conducted in the proposed system location 0 Yes ❑No <br /> A soil observation was made within the most limiting area of the proposed system ❑Yes ❑No <br /> Soil boring log forms completed and attached ❑Yes ❑No <br /> Percolation tests performed,forms completed and attached ❑Yes ❑No <br /> 5. Phase I.Reporting Information <br /> Depth to standing water inches Anticipated construction issues <br /> Flood elevation feet <br /> Depth to bedrock inches <br /> Depth to periodically saturated soil inches <br /> Maximum depth of system 48" inches <br /> Elevation at system bottom feet Differences between soil survey and field evaluation <br /> Percolation rate 15 min/inch <br /> Loading rate 0.78 gpd/ft' <br /> Contour loading rate 12 gpd/ft <br /> Site evaluation issues/comments <br /> I hereby certify that I have completed this work in accordance with all applicable ordinances,rules and laws. <br /> Swedlund Septic �.J'J'- -k 2502 10/17/14 <br /> (Designer) (Signature) (License#) (Date) <br />
The URL can be used to link to this page
Your browser does not support the video tag.