My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000 - P02940 - mechanical
Orono
>
Property Files
>
Street Address
>
W
>
Woodhill Road
>
200 Woodhill Road - 02-117-23-12-0001 Country Club
>
Permits/Inspections
>
2000 - P02940 - mechanical
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:06:16 PM
Creation date
2/25/2020 12:21:55 PM
Metadata
Fields
Template:
x Address Old
House Number
200
Street Name
Woodhill
Street Type
Road
Address
200 Woodhill Rd
Document Type
Permits/Inspections
PIN
0211723120001
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PD (9-NC-7 <br /> CITY OF ORONO APPLICATION FOR MECHAN CAL PERMIT <br /> Box 66 (2750 Kelley Parkway) <br /> Crystal Bay, MN 55323 v c 1 <br /> 2000 <br /> GENERAL INFORMATION CI FY Ur UHONO <br /> 1. You may apply for mechanical permits by mail or in person at the City offices. Applications will be <br /> reviewed and a permit will be issued within 2 working days. <br /> 2. Permit cards will be sent by return mail after a review is completed. PERMITS ARE NOT VALID <br /> UNTIL YOU RECEIVE A PERMIT. WORK MUST NOT BEGIN UNTIL THE PERMIT CARD IS <br /> POSTED ON THE JOB SITE. <br /> 3. Mechanical Designs - Complete calculations, details and specifications are required for each heating, <br /> ventilation, humidification-dehumidification, and air conditioning installation including heat loss/heat gain <br /> calculation, design temperatures, equipment ratings and identification as to type, manufacturer and model. <br /> Data shall be presented on form provided. Identification of and specifications for water heating equipment <br /> shall also be provided. <br /> 4. When any new construction or remodeling is involved, a separate building permit must be obtained. <br /> 5. All work must be done in accordance with the Uniform Mechanical Code/State Building Code <br /> requirements. <br /> 6. All work must be inspected (rough-in and final). Call 473-7357. 24-hour notice required. <br /> 7. House Heating Test Record must be submitted before final. <br /> Instructions Complete all items on this application. Compute the permit fee. Sign and date the certification. <br /> INCOMPLETE APPLICATIONS WILL NOT BE PROCESSED. If you have questions, call 473-7357. <br /> Please check one: New Addition Repair Replace <br /> Reside ti C.u i ercial <br /> JOB SITE: any ' • Zip: 55�d11 <br /> Owner's Name: l,ijBg jy, 1 d yfty/ e) Telephone Number: i{- --_r;�3 j i <br /> Mailing Address: ped B9 1 .4 City: Zip: 5S _r <br /> Contractor's Name: £2` P ys, * y1G , Telephone Number: „ – ,-- - 3-g <br /> Mailing Address: ) - a1g t 0 y►,. City: 1)-4fie) Zip: .3 <br /> SYSTEM DESCRIPTION <br /> HEATING SYSTEMS / N <br /> Quantity: (p - ,1//f011/ja— <br /> Make: L/yl. e_ <br /> Model: A4/A .5-4A4/A .5-44-)A1Wei,'A4/A .5-44-)A1 / _%i. <br /> Fuel: Ale ' ' <br /> Flue Size: <br /> Input BTUs: 3 O <br /> Output BTUs: <br /> CFM: 17 <br /> .50 <br /> COOLING SYSTEMS <br /> Quantity: <br /> Make: <br /> Model: <br /> Tons: <br /> H. Power • <br />
The URL can be used to link to this page
Your browser does not support the video tag.