Laserfiche WebLink
/ /4' <br /> O \\ <br /> I ,,� ; r ., <br /> CITYof ORONO <br /> ly: ✓ „ /j Municipal Offices <br /> w� G Street Address: Mailing Address: <br /> Egli 2750 Kelley Parkway P.O. Box 66 <br /> Orono, MN 55356 Crystal Bay, MN 55323-0066 <br /> July 7, 2000 <br /> Charles & Marla Maile <br /> 1260 Woodhill Avenue <br /> Wayzata, Mn 55391 <br /> Dear Mr. & Mrs. Maile: <br /> An inspection of your septic system was conducted on July 6, 2000. A summary of the inspection <br /> is below. <br /> Septic Tank Condition <br /> 1. Pumpout needed within one year (last pumpout date 10/6/97). <br /> The septic system is a compliant system, meaning it meets all or most current City and State <br /> Standards. Enclosed is a list of licensed contractors who work in Orono on a regular basis. This <br /> list is enclosed simply for your reference in case your septic system needs maintenance in the future. <br /> Also enclosed is a fact sheet explaining your septic system and how it functions. Finally, an as-built <br /> drawing is enclosed showing the approximate location of the septic system. <br /> If you have any questions regarding this report, please contact me at the City Offices at 249-4600. <br /> Re ectfull , <br /> ris Pence <br /> On-Site Systems Manager <br /> Enclosures <br /> In the event this inspection report is used to satisfy the requirements for a mortgage or other transfer of property, <br /> be advised that this report does no guarantee or certify the existing system will continue to function properly,but <br /> is merely an opinion of the adequacy of the system under current conditions based on the available information. <br /> This report must be kept on the premises with the system location and pumping records. <br /> Telephone(952)249-4600 • Fax(952)249-4616 <br /> www.ci.orono.mn.us <br />