My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-08-1987 - Septic system, 2nd proposal
Orono
>
Property Files
>
Street Address
>
W
>
Woodhill Avenue
>
1255 Woodhill Ave - 02-117-23-24-0011
>
Septic
>
06-08-1987 - Septic system, 2nd proposal
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:07:45 PM
Creation date
2/25/2020 10:36:51 AM
Metadata
Fields
Template:
x Address Old
House Number
1255
Street Name
Woodhill
Street Type
Avenue
Address
1255 Woodhill Ave
Document Type
Septic
PIN
0211723240011
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
existing grade <br /> • <br /> .rn �'' G U 2 _:_back fill 6"min. <br /> 3 to4n�� lCover of unc\ompocted I • <br /> N .NN <br /> hay or straw covered with ' O 4 pipe dia. <br /> red rosin paper , <br /> )2_,'rock filter material <br /> rake sidewallls a bottom to I • 1 <br /> SET- BACKS remove smearing <br /> . HOUSE System must be: • <br /> Tank II' from property lines TRENCH X- SECTION <br /> 'lc. from wells , <br /> aO from bldgs. (min. of two trenches) <br /> 0 <br /> a Do. Treatmen' area - fran lakes, 5=61-": 11.4 (max, length 100') <br /> Treatment area ' from property lines 1 <br /> MA�uo ES Tx C" _" from wells <br /> • . - A� A <br /> ` <br /> `� r'`L 22,from bldgs. <br /> /n from trees ote:Power supply and switches must be in a weather <br /> SOIL BORING ELEVATIONS <br /> I I proof enclosure- outside -pumping chamber <br /> dQminrt- . - �_ - - -- - - - _ <br /> —I = 1 , . i ; �' TH.I EL.-2 -ms's' �cAL9c6 .a <br /> .,- -ti' , ,__r� r-', (4 <br /> 7onk Tank ' -, Grade / %s TH.73 EL.-gs61.1 <br /> Drop to Tank \ - - TH"4 EL- •3- <br /> Min. I��to 8� At least 41/2'of undisturbed <br /> Pumping • earth between trenches TH75 EL.-0/4 ) ,o <br /> t max.rto41 • -f1 '1.1 S S\� l_\_.ociJ Chamber DROP BOXES ELEVATION at PROPOSED PUMPING <br /> 4"to 6"dia.pipe - CHAMBER-„- (ground elev.) <br /> ;.4.9.y.or'L , St-)V3 CAL- 96 d.O <br /> SYSTEM DESIGN - <br /> TYPE-S,5 BEDROOM - Percolation rate a,L ,min./inch (design>i - 14..c min./inch) -T\4 �S m.-n),',., _ • <br /> Treatment area required w/j' of rock filler materiallana'10% =i.atrsq.ft. of trench bottom area needed ÷ trench width = lin.ft.of trench needed , number of drop boxes <br /> • <br /> Number of tanks required_2_ 1st tank 12,-;c;gaL, 2nd ton al. minimums P�-�5 (to be determined by the instol!er} <br /> kl�� Qi,am, ir�v �F1Fm�c� <br /> Clean rock'-74 cu.yds. ( 3/4 to 2 I/2"dia.,includes 2"above pipe) PROPERTY OF SnN�\ tin \Do(A.) <br /> Pumping chamber capacity= 25% of daily sewage flow'of 2,ya gal.=)4Si‘gal.s-Reserve.storage=gtal. Pine boc Kdrainagei gaL= q�� gal. cop. '-O - 1 9)�� 1 / (-Linn\'• 4i <br /> ISo F> ry .n )a so 3g1.4to ZD1-�0 <br /> ( Reserve storage tt= 5 gal./ bedroom = '�c gal. t pipe bock drainage.. gal./1001in.ft.3"pipe- length of pipe needed app I L C ft. V 30 gal.) r T��" N S-1.-0.1, (`�' ' <br /> Pump size JL3 hp w/mercury float pump controls a � 3H' l-ttNo - . .55 <br /> S-P TEST/NG /NC <br /> • Note: When constructing bed - , this area should be shaped Note: Distance from treatment area to neighboring wells— Designed By: 7.,•./7./,_,----(2 - . t..)-1---,---- <br /> to divert run-off from entering treatment area. 1_,,?. -11,-- - - N-J 1('n <br /> _ <br /> Date .//21/. 2 , PH. 612-497-3566 <br />
The URL can be used to link to this page
Your browser does not support the video tag.