My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Wetland Code Compliance check/Wetland Buffer Ordiance
Orono
>
Property Files
>
Street Address
>
W
>
Willow Drive South
>
0505 Willow Dr S - 04-117-23-41-0012
>
Correspondence
>
Wetland Code Compliance check/Wetland Buffer Ordiance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:12:21 PM
Creation date
2/24/2020 12:44:55 PM
Metadata
Fields
Template:
x Address Old
Address
0505 Willow Dr S
Document Type
Correspondence
PIN
0411723410012
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEIVED <br /> OCT 19 2010 <br /> Memorandum CITY OF ORONO ' Bonestroo <br /> 2335 Highway 36 W <br /> To: Melanie Curtis Project: Majextic Spruce Lot 2 Date: 11/18/2010 St. Paul,MN 55113 <br /> From: John Smyth Client: City or Orono Tel 651-636-4600 <br /> Fax 651-636-1311 <br /> Re: Wetland Buffer Ordinance File No: 139-10000 www.bonestroo.com <br /> Remarks: <br /> I reviewed the Majestic Spruce Lot 2 on November 11, 2010. Both Lots 1 and <br /> 2 have a Wetland Buffer Establishment and Management Plan that is dated <br /> October 10, 2008 (attached). This management plan was prepared on behalf <br /> of the owners by Anderson Engineering of Minnesota, LLC to meet the <br /> requirements of the City's wetland code at the time of the lot split. Per my <br /> 10/17/2008 memo the attached management plan was approved with the <br /> following modification: "The plan indicates seeding of the buffer of Wetland B <br /> but not the buffer of Wetland A. The years of grazing have impacted the <br /> vegetation of the buffer of Wetland A and it should be seeded with the same <br /> mix and follow the same establishment and maintenance procedures as the <br /> buffer of Wetland B." <br /> Lot 2 is required to implement the Wetland Buffer Establishment and <br /> Management Plan to be in compliance with their original approval. This plan <br /> includes: <br /> 1. Seeding the buffer with a native seed mix (BWSR U8). Requires <br /> spraying or some other way to remove existing vegetation. <br /> 2. Relocating existing fence on upslope edge of wetland buffer to <br /> protected buffer from grazing. <br /> 3. Per watershed requirement grading a pond at the southwest corner of <br /> the property. <br /> 4. Completed installation and general buffer management per plan. <br /> This work needs to be completed to be in compliance with the original <br /> approval of the lot split. <br />
The URL can be used to link to this page
Your browser does not support the video tag.