Laserfiche WebLink
G., MOUND SLOPE WIDTH & LENGTH Landslope > 1% slope <br /> (landslope greater than 1%) ever 1 <br /> 1. Downslope absorption width = absorption width <br /> minus rock layer width �h�✓� 6"(D2) Topsoil. <br /> ��.� +:•:+ 5 tP:ft lean Sendt 1 <br /> I .r. ... <br /> ft- 1 0 ft= 12 -ft <br /> paration - �•� <br /> Restricting Llyer <br /> Upslo Wldth(G2d) Rock idth(D2) Downs Wldth(C2q <br /> 2. Calculate mound size -h O it <br /> UPSLOPE <br /> a. Depth of clean sand fill at upslope edge of AbsorptionWidth-5-d(n <br /> rock layer = 3 ft minus the distance to restricting layer (Cl) asp 30 <br /> 3ft- ft = '0 ft <br /> b. Mound height at the upslope edge of rock D-34: SLOPE MULTIPLIER TABLE <br /> layer = depth of clean sand for separation (G2a) Land UPSLOPE DOWNSLOPE <br /> Slope multiplifor various multi liers for various <br /> at upslope edge plus depth of rock layer (1 ft) in% sloers pe ratios sPope ratios <br /> plus depth of cover (1 ft) 3:1 4:1 5:1 6:1 7:1 8:1 3:1 4:1 5:1 6:1 7:1 <br /> r0 ft + ift + 1ft = .�,0 ft 0 3.0 4.0 5.0 6.0 7.0 8.0 3.0 4.0 5.0 6.0 7.0 <br /> c. Upslope berm multiplier based on land slope 1 2.91 3.85 4.76 5.66 6.54 7.41 3.09 4.17 5.26 6.38 7.53 <br /> �-1 z (see figure D-34) 2 2.83 3.70 4.54 5.36 6.14 6.90 3.19 4.35 5.56 6.82 8.14 <br /> d. Upslope width = berm multiplier (G2c) times 3 2.75 3.57 4.35 5.08 5.79 6.45 3.30 4.54 5.88 7.32 8.86 <br /> upslope mound height (G2b): 4 2.68 3.45 4.17 4.84 5.46 6.06 3.41 4.76 6.25 7.89 9.72 <br /> 5 2.61 3.33 4.00 4.62 5.19 5.71 3.53 5.00 6.67 8.57 10.77 <br /> 3•}Z x r��ft =�_f t 6 2,54 3.23 3.85 4.41 4.93 5.41 3.66 5.26 7.14 9.38 12.07 <br /> DOWNSLOPE 7 2.48 4;gj 3.70 4.234 70 5.13 3.80 7.69 10.34 13.73 <br /> e. Drop in elevation = rock layer width (D2) times 8 2,42 3.03 3.57 4.05 4.49W 4.88 3.95 5.88 8.33 11.54 15.91 <br /> percent landslope (C5) = 10,0 9 2.36 2.94 3.45 3.90 4.30 4.65 4.11 6.25 9.09 13.04 18.92 <br /> )0 X_0 %_ 100 = -/)_f t 10 2.31 2.86 3.33 3.75 4.12 4.44 4.29 6.67 10.00 15.00 23.33 <br /> f. Downslope mound height= depth of clean 11 2.26 2.78 3.23 3.61 3.95 4.26 4.48 7.14 11.11 17.65 30.4? <br /> sand for slope difference (G2e) at downslope 12 2.21 2.70 3.12 3.49 3.80 4.08 4.69 7.69 12.50 21.43 43.75 <br /> rock edge plus the mound height at the <br /> upslope edge of rock layer (G2b) <br /> 3,0 ft + ) ft = 3.? ft <br /> g. Downslope berm multiplier based on percent land slop <br /> (see figure D-34) 91 _ 1)3 <br /> _ <br /> h. Downslope width = downslope multiplier Upsloefwidth(G fd ) <br /> (G2g) times downslope mound height(G20401 p <br /> A•s(1.9 X 3 ft = p _ftRock Bed <br /> $ !!j!P Width(G2d) Width(D2) __LLUpsl�o�e Width(G2d)- <br /> i. Select the greater of G1 and G2h as the M Length(M) 55 <br /> downslope width: I ft Downslope Width(4321) a) ft <br /> j. Total mound width is the sum of upslope Absorption Width(F)� <br /> width (G2d) width plus rock layer width _ a}'_ <br /> (D2) plus downslope width (G2i) Total Length(G2k)2(0 it <br /> 1=7 _ft+ /0 ft+ ate_ft= �_ft <br /> k. Total mound length is the sum of upslope width (G2d) <br /> plus rock layer length (D3) plus upslope width (G2d) <br /> !-ft+ 55 ft+ ft = _2feet <br /> a } + ss - a } = 9 Final Dimensions: <br /> P+Gp r)i -(0 L"M Lf�0'� S V C-Owl :sq 5'- Ov4 o X 1B AJO <br /> I hereby certify that I havecompleted this work in accordance with applicable ordinances, rules and laws. <br /> I/�� , (signature) _(license#) date) <br />