Laserfiche WebLink
0 _ Wt w(al (01.07 <br /> 0‘a.,:).40 CITY OF ORONO <br /> Pa Municipal Offices <br /> j.'. Ala F� Street Address Mailing Address: <br /> t4 �� tok 0 2750 Kelley Parkway P.O. Box 66 <br /> .4 , vHO� , Orono,MN 55356 Crystal Bay,MN 55323-0066 <br /> To: The Current Owner of Address 2485 WOODHAVEN DR <br /> City Ordinance requires that onsite sewage treatment systems in Orono be inspected on a <br /> periodic basis. The onsite sewage treatment system at the above address has been inspected and <br /> the following is known about the system. A sketch of the known components of the system is <br /> available for most properties at the Orono City Hall. <br /> Imminent Public Health Threat <br /> Yes <br /> No lr <br /> If yes, please contact the Onsite Systems Manager at 954-249-4626 within 10 days of receipt of <br /> this notice. The septic system must be brought into compliance within 90 days. Failure to do so <br /> will result in referral to the City Attorney for legal action. <br /> System Identified as Non-Compliant <br /> Yes v <br /> No <br /> If yes, system must be brought into compliance by: <br /> December 31, 2007 / <br /> December 31, 2010 <br /> Other <br /> Septic Tank(s) Pulrout Needed <br /> Yes �V <br /> No <br /> The city recommends the septic tank(s) and/or lift tank be serviced and pumped out every three <br /> (3) years. City records indicate the tank(s)were last pumped out on ( q l ( . <br /> The tank(s) should be cleaned through the manhole and not through the inspection pipes, this <br /> allows for proper cleaning. <br /> Comments: <br /> Inspect Date of Inspection: '" 07 <br /> Telephone (952) 249-4600 • Fax (952) 249-4616 <br /> www.ci.orono.mn.us <br />