Laserfiche WebLink
Fees to tie Charged , . . •,. . '=YES NO, <br /> Penrtit .; .. <br /> Plan Review • ' ` ' <br /> i <br /> Investigation Fee <br /> • • SAAC-' nber of SAC Units ' t/ <br /> Other(specify) <br /> • Square Footage $ per Sgtfire Footage <br /> Basement X = $ <br /> 1St Floor X = $ <br /> 2nd Floor X = $ <br /> Garage X = $ <br /> Estimated Construction Value: $ �� <br /> Orono Inspections Required Work Requiring Separate Permits <br /> O Footing 0 Site Plumbing 0 Grading/Filling <br /> O Poured Wall 0 Silt Fence/Erosion Control Mechanical 0 Fire <br /> O Foundation Survey 0 Hardcover Removal 0 Fireplace 0 Water Connection <br /> O Framing 0 Other(specify) 0 Masonry 0 Sewer Connection <br /> O Waterproofing/Drain tile 0 Mfg. 0 Lawn Irrigation <br /> O Foundation Waterproofing 0 Other(specify) 0 Landscaping <br /> Framing <br /> Insulation <br /> O As-Built Survey <br /> 21Final <br /> 153(Lathe Required State Permits <br /> O Other(specify) <br /> 0 Well XElectrical <br /> REMARKS (in-house): <br /> OFFICIAL REMARKS-TO BE NOTED ON PERMIT AND INITIALLED: <br /> O See Builder Acknowledgement Form <br /> O Prior to release of escrow money an as-built survey and hardcover calculations must be submitted and approved. <br /> Updated: October 2016 <br /> v:\forms\plan review checklist 10-2016.docx <br />