My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018 - 00258 - new structure
Orono
>
Property Files
>
Street Address
>
W
>
Wood Duck Trail
>
2895 Wood Duck Trail - 33-118-23-24-0031
>
Permits/Inspections
>
2018 - 00258 - new structure
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:48:51 PM
Creation date
2/24/2020 8:41:04 AM
Metadata
Fields
Template:
x Address Old
House Number
2895
Street Name
Wood Duck
Street Type
Trail
Address
2895 Wood Duck Trail
Document Type
Permits/Inspections
PIN
3311823240031
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Christine Mattson <br /> From: Adam Edwards <br /> Sent: Wednesday, March 21, 2018 1:48 PM <br /> To: Christine Mattson <br /> Subject: RE: 2895 Wood Duck Trail/#2018-00258 <br /> Chris, <br /> I've reviewed the revised survey and stamped it approved with the following comments: <br /> 1. A driveway and proposed grading is depicted on the turnaround however the turnaround is already paved and <br /> should remain so until such time as the road is continued to the west. <br /> 2. The retaining wall is shown at exactly 4 feet. If the wall exceeds 4 ft an engineered design will be required. <br /> 3. The water service connections must be protected from construction traffic during construction. <br /> 4. A separate utility permit will be required for the sewer and water connections. <br /> 5. The grading plan contains element of the development grading requirements (retaining wall and EOF for <br /> pond). These will need to be completed as part of the lot grading and included on the grading as-built prior to <br /> issuance of a CO. <br /> Adam <br /> From:Christine Mattson <br /> Sent:Tuesday, March 20, 2018 4:16 PM <br /> To:Adam Edwards<aedwards@ci.orono.mn.us> <br /> Subject: RE: 2895 Wood Duck Trail/#2018-00258 <br /> Adam, <br /> We received an updated survey. Please re-review and provide comments. <br /> Thank you! <br /> From:Adam Edwards <br /> Sent:Tuesday, March 13, 2018 2:40 PM <br /> To:Christine Mattson<CMattson@ci.orono.mn.us> <br /> Cc: Roger Peitso <rpeitso@ci.orono.mn.us> <br /> Subject: RE: 2895 Wood Duck Trail/#2018-00258 <br /> Chris, <br /> I've reviewed the plans and Stamped them approved but offer the following comments: <br /> 1. The retaining wall is shown at exactly 4 feet. If the wall exceeds 4 ft an engineered design will be required. <br /> 2. The water service connections must be protected from construction traffic during construction. <br /> 3. A driveway is depicted on the turnaround however the turnaround is already paved and should remain so until <br /> such time as the road is continued to the west. <br />
The URL can be used to link to this page
Your browser does not support the video tag.