Laserfiche WebLink
. <br /> ' • <br /> • Fees to be Charged , YES, `, - " ."NO ' ' <br /> • . Plan Review • <br /> State Surcharge p • & s <br /> , Investigation Fee 1/ <br /> SAC—Number of SAC Units x i= twit e Vit <br /> Other(specify) V— <br /> Square Footage $ per Square Footage <br /> Basement Kin,54k &39 X /e70.2.4 = $ 55, (e/6.0/- <br /> AG. frn f%ti f tQf �,/ ?(C, X 0850-1 = $ 33 i / � 5 ,767 <br /> 10 2nd Floor /3690 (4 /626Z., X leo I � = $3=0ZJ 986. 7Z <br /> Garage` 9,,,, i bg7 pi Z _ X se 7� = $ 39- 1 13 , f3g <br /> '-•t <br /> Estimated Construction Value: $ 5 97lY 00 ✓— <br /> " Orono Inspections Required Work Requiring Separate Permits <br /> Footing ❑ Site Plumbing 0 Grading/Filling <br /> Poured Wall 'Silt Fence/Erosion Control 1 Mechanical 0 Fire <br /> .Foundation Survey ❑ Hardcover Removal e".Fireplace Water Connection <br /> ❑ Framing' 0 Other(specify) 0 Masonry Sewer Connection <br /> Waterproofing/Drain tile Mfg. 0 Lawn Irrigation <br /> O. Foundation Waterproofing 0 Other(specify) 0 Landscaping <br /> Framing <br /> 'nsul:tic^ <br /> As-Built Survey <br /> Final <br /> Lathe Required State Permits <br /> ❑ Other(specify) <br /> 0 Well Electrical <br /> REMARKS (in-house): <br /> OFFICIAL REMARKS -TO BE NOTED ON PERMIT AND INITIALLED: <br /> O See Builder Acknowledgement Form <br /> O Prior to release of escrow money an as-built survey and hardcover calculations must be submitted and approved. <br /> Updated: October 2016 <br /> v:\forrns\plan review checklist 10-2016.docx <br />