Laserfiche WebLink
AWN- <br /> CITY OF ORONO <br /> r1 Street Address: Mailing Address: Telephone(952)249-4600 <br /> � (1H. <br /> r G` 2750 Kelley Parkway P.O.Box 66 Fax (952)249-4616 <br /> t-9kESH111 O Orono,MN 55356 Crystal Bay,MN 55323 www.ci.orono.mn.us <br /> August 1, 2017 <br /> Kevin Cummins <br /> David Weekley Homes <br /> 12800 Whitewater Drive#20 <br /> Minnetonka, MN 55343 <br /> Re: Building Permit Application#2017-00850 <br /> 2875 Wood Duck Trail <br /> On July 19, 2017 the City received a building permit application for a new single family home. Staff conducted a preliminary <br /> review based on the information provided and recommends the following items be submitted or revised in order for your <br /> application to be considered complete and for the plan review to continue: <br /> 1. Certificate of Survey. A survey dated 7-14-17 was submitted; however, additional information is required. Please <br /> provide two copies of an updated, full-size certificate of survey which meets all of the City's survey standards <br /> (enclosed)and addressing the following items: <br /> a. Top of Foundation. The top of foundation elevation is shown on the survey. Please have the surveyor show <br /> the point or spot where the top of foundation elevation is in reference to. Please note, we expect the <br /> location to be consistent when submitting the foundation as-built. <br /> b. Call out first floor elevation and list with other Proposed Elevations on the survey. <br /> c. A sidewalk(minimum 24")should be added from front porch to driveway. <br /> d. Erosion control measures should be shown. <br /> 2. Landscape Plan. Prior to the issuance of the building permit a landscape plan coordinating with the survey must be <br /> submitted showing all the proposed exterior/landscaping improvements, i.e. patios, grading, sidewalks, retaining <br /> walls, etc. The plan should include the name of the individual performing the work. Any proposed patios,grading, <br /> sidewalks, retaining walls shown on the landscape plan should also be reflected on the survey. <br /> 3. Hardcover Calculations. The property is located in Tier 4 of the Stormwater Quality Overlay District. Hardcover <br /> calculations were provided, but additional information is needed. While staff doesn't feel hardcover exceeds the <br /> allowed 50%, accurate information is necessary. The proposed sidewalk needs to be added to the hardcover <br /> calculation shown on the survey. Provide updated information. <br /> 4. Minnehaha Creek Watershed District(MCWD). Your project may trigger the Minnehaha Creek Watershed District's <br /> (MCWDs) permitting requirements; please contact the MCWD directly at 952-471-0590 regarding your project. <br /> Please note,the City of Orono will not issue a building permit without a copy of the MCWD permit or documentation <br /> stating the proposed project does not trigger any of their permitting requirements. <br /> Please feel free to contact me at 952.249.4620 or by email at cmattson@ci.orono.mn.us if you have any questions on the <br /> above requirements. <br /> Sincerely, <br /> CITY OF ORONOOR <br /> lkst.) <br /> Christine Mattson <br /> Planning Assistant <br /> c via email Kevin Cummins <br /> Dennis Olmstead <br /> Roger Peitso, Building Official <br /> enclosures <br />