Laserfiche WebLink
, 1 -02-'17 15:38 FROM- T-871 P0002/0005 F-237 <br /> MECHANICAL SYSTEMS BEING INSTALLED <br /> Note:All Geothermal Systems will now require a Site Plan&Review by our Building Official. <br /> IS THIS GEOTHERMAL? ❑Yes ❑No <br /> HEATING SYSTEMS <br /> Quantity: <br /> Make: <br /> Model: <br /> Fuel: <br /> Flue Size: <br /> Input BTUs: <br /> Output BTUs: <br /> CFM: <br /> COOLING SYSTEMS <br /> Quantity: <br /> Make: <br /> Model; <br /> Tons: <br /> H.Power <br /> 1FIREA rACFs <br /> Xi ' •• E51110 eitilOOOL7M <br /> VENTILATION <br /> ❑ No. Kitchen Exhaust duct recirculating cfm <br /> ❑ No. Bath Exhaust(must have duct outside) cfm <br /> ❑ No. Other Fans: Locations cfm <br /> FUEL STORAGE (Must be approved by Fire Marshall if proposing to abandon tank in place.) <br /> ❑ Installation ❑ Removal <br /> Fuel Oil: gallons ❑ Underground ❑Inside []Outside <br /> LP Gas: gallons <br /> Other: <br /> GAS LINE ONLY <br /> ❑ Outdoor Grill ❑ Other/List What&Where: <br /> 7 <br />