Laserfiche WebLink
4. Submit a $2,500 escrow and an escrow agreement signed by the property owner. <br /> 5. Keep all structure(s) enclosed and/or secured until such time as demolition is complete. <br /> 6. Keep all demolition debris off adjoining property and/or the public rights-of way unless specific <br /> prior approval is obtained in writing for temporary use thereof. <br /> 7. Completely remove foundation(s)from the ground. <br /> 8. Completely dispose of all demolition debris off site in accordance with all applicable PCA <br /> requirements. <br /> 9. Abandon water wells in accordance with State Health Department regulations. <br /> 10. Call for an inspection when all debris has been removed, before backfilling. <br /> 11. Within 5 working days of superstructure removal, a final inspection shall be requested. The site <br /> shall be left clean and clear of all debris, with any excavation filled with earth level with the <br /> adjacent ground elevation (except when such excavation is to be used as part of a new building <br /> and such new building is actually under construction). <br /> 12. Abandon septic systems per Minnesota Rules Chapter 7080. All septic tanks must be pumped, <br /> crushed and filled with native soils. An inspection is required after the tanks are pumped and <br /> before the tanks are crushed and filled. <br /> 13. The undersigned owner shall and hereby does indemnify and hold harmless the City of Orono, <br /> its agents, employees and assigns from and against all claims, damages, losses or expenses, <br /> including attorney fees, against the City, its agents, employees and assigns arising out of or <br /> resulting from the demolition described herein as performed by the property owner, his <br /> employees, agents. subcontractors or assigns. <br /> PERMIT TYPE AND FEE CALCULATION <br /> [$75.00 - Principal Structure $ 75 (/) <br /> $50.00 -Accessory Structure x (how many) <br /> 1. Subtotal of above permit requested $ <br /> 2. State Surcharge //rr�� 5.00 <br /> 3. TOTAL PERMIT FEE (add lines 1-2 above) $ TO t 0?) <br /> The undersigned herby applies to the City of Orono for issuance of a Demolition Permit, agrees to do <br /> all the work in a strict accordance with the % dinances of the City and the regulations of the State of <br /> Minnesota, and certifies that all statem-., s'' .de • this application are complete, true and correct. <br /> %~f' //' <br /> Applicant's Signature: • Vie!gwi./1W ri Date: <br /> Owner's Signature: _i' ib Date: I5 04.1 113 <br /> Approved By: • • 4' Date: -t` -2.6 <br /> (Building Official) <br /> *Zoning Disclosure Required? YES ❑ NO <br /> *This must be filled out by Zoning D artment—For either answer. a Zoning Official must sign all applications. <br /> acwaiN---- z <br /> * Approved By: 0_ ,11,,4w ¢Date: 0 ' ( �) <br /> (Zoning Official) <br />