Laserfiche WebLink
Fees to be Charged YES NO <br /> Permit <br /> Plan Review <br /> Staf Surcharge <br /> Investigation Fee <br /> SAC—Number of SAC Unite <br /> Other(specify) <br /> Square Footage $ per Square Footage <br /> Basement X = $ <br /> 15t Floor X = $ <br /> 2nd Floor X = $ <br /> Garage X = $ <br /> Estimated Construction Value: $ <br /> Orono Inspections Required Work Requiring Separate Permits <br /> Footing 0 Site Plumbing 0 Grading/Filling <br /> Poured Wall Silt Fence/Erosion Control Mechanical 0 Fire <br /> Foundation Survey 0 Hardcover Removal Fireplace 0 Water Connection <br /> 0 Framing 0 Other(specify) 0 Masonry Cl Sewer Connection <br /> ' 9.Waterproofing/Drain tile Mfg. 0 Lawn Irrigation <br /> 0 Foundation Waterproofing 0 Other(specify) Cl Landscaping <br /> Framing <br /> Insulation <br /> As-Built Survey <br /> Final <br /> Lathe Required State Permits <br /> 0 Other(specify) <br /> 0 Well Electrical <br /> REMARKS (in-house): <br /> OFFICIAL REMARKS -TO BE NOTED ON PERMIT AND INITIALLED: <br /> See Builder Acknowledgement Form <br /> 0 Prior to release of escrow money an as-built survey and hardcover calculations must be submitted and approved. <br /> Updated: October 2016 <br /> v:\forms\plan review checklist 10-2016.docx <br />