Laserfiche WebLink
Builder Acknowledgement Form <br /> Permit #2017-00940 / 500 Willow Drive South <br /> Builder Representative Name: Or- -50 t-\ <br /> Permit Conditions: Initials <br /> "NOTE CHANGE" Before scheduling an exterior insulation and/or drain tile inspection, a <br /> foundation as-built survey must be submitted and approved by the City or a Stop Work order V <br /> s. <br /> will be issued. V" <br /> Schedule a minimum of one hour for the framing inspection. <br /> WS <br /> Erosion control mechanisms must be installed and inspected by the City prior to any land <br /> disturbing activities. The contractor must provide a minimum of a 24 hour notice prior to <br /> inspection. S <br /> Erosion control shall be installed and maintained throughout the entire project and must <br /> remain until vegetation has been established. bus <br /> A haul route shall be submitted to the City Engineer for approval and inspection prior to <br /> commencement of hauling from the site.The property owner shall be responsible for cleaning <br /> and repair of roadways for any adverse impacts. <br /> No underground sewer within 20 feet of well. <br /> 1,cJS <br /> Prior to the issuance of a Certificate of Occupancy an as-built survey must be submitted and <br /> approved. v�S <br /> In the event of winter or other extended unfavorable weather conditions(which prevent the <br /> completion of the exterior improvements and/or as-built survey) a Temporary Certificate of <br /> Occupancy(TCO) may be necessary. A TCO requires a $10,000 escrow. <br /> Advisory Comments <br /> Any changes to the exterior/landscaping improvements, i.e. patios,grading, sidewalks, retaining <br /> walls, etc. not currently shown on the approved survey and landscaping plan will require a <br /> separate Zoning Permit application to be submitted and approved prior to the work <br /> commencing. <br /> Any retaining walls that are over 4-feet in height or tiered walls not separated by twice of the <br /> height of the lower wall require engineered plans and a building permit to be submitted and <br /> approved prior to construction. The proposed walls on the northeast corner are very close to <br /> requiring plans. If the height of the walls change during construction, plans must be submitted <br /> and approved prior to construction. <br /> wAstreet files\willow drive south\500\builder acknowledgement form 2017-00940.docx <br />