My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-00501 - Mound Septic - new/replacement
Orono
>
Property Files
>
Street Address
>
W
>
Willow Drive South
>
0500 Willow Dr S - 03-117-23-32-0028
>
Septic
>
2017-00501 - Mound Septic - new/replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:11:03 PM
Creation date
2/20/2020 9:38:38 AM
Metadata
Fields
Template:
x Address Old
Address
0500 Willow Dr S
Document Type
Septic
PIN
0311723320028
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
New or Replacement System $400.00 <br /> Repair Existing System 100.00 <br /> (Tanks or Drainfield) <br /> Total `f�`O� <br /> The undersigned hereby applies to the City of Orono for issuance of a septic system <br /> installation permit, agrees to do all the work in strict accordance with ordinances of the City <br /> and regulations of the State of Minnesota and certifies that all statements made on this <br /> application are complete, true and correct. <br /> Signature of Applicant Date: <br /> MPCA License No.: oa - <br /> Staff Review: A pt D Hied <br /> Reviewer: Date:_ <br /> Reason for Denial: <br /> Comments (to be printed on inspection card): <br /> 1. Applications for septic system permits may be mailed or submitted in person at the City <br /> offices; however, permits will not be mailed out. The permit must be picked up in person at <br /> the City offices and work must not begin unless the permit card is on the job site. <br /> *** DO NOT MAIL PAYMENT WITH THIS APPLICATION *** <br /> 2. Permits will be only issued to contractors holding a Minnesota Pollution Control Agency <br /> (MPCA) Septic System Installers License. <br /> 3. All work must be done in accordance with the approved septic system design. <br /> 4. The following inspections will be required for all septic systems: <br /> A. Tank installation prior to covering. <br /> B. Drainfield trench installation prior to covering. For mounds, inspection is required after <br /> rough up, but prior to sand placement (sand must be jar tested for silt content) and <br /> again during pressure distribution piping installation in the rock bed. <br /> C. Final inspection to verify final cover depths and to verify that all pump station (where <br /> required) components are functional and comply with codes. <br /> 5. MPCA licensed Installers or their DRP (Designated Responsible Person) shall be present <br /> during all inspections. <br /> Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.