418 ARTICLE XIV.-INTERIM USES <br /> 1419 <br /> 420 DIVISION 1.-GENERALLY <br /> 421 <br /> 422 Sec.78-1726.-Interim use permit required. <br /> 423 An application for an interim use permit shall be accompanied by a certified site plan showing the <br /> 424 location of the proposed excavation or storage and shall state the amount of material which is to be <br /> 425 removed,excavated or stored,placed,or graded,and such other information as the council may require. <br /> 426 Applications shall be filed with the city administrator and shall be accompanied by a deposit to be <br /> 427 determined by the city,which will be used to offset the cost of processing the application.Any unused <br /> 428 portion will be refunded to the applicant. <br /> 429 (a) Except where otherwise provided in the article,it is unlawful for any person to perform or have <br /> 430 performed the following land alteration activities without an interim use permit issued by the <br /> 431 council: <br /> 432 (1) Mining.The commercial extraction of sand,gravel or other material from the land and their <br /> 433 removal from the site without processing shall be mining. In all districts,the conduct of <br /> 434 mining shall be permitted only upon issuance of a interim use permit. Such permit shall <br /> 435 include, as a condition, a plan for a fmished grade which will not adversely affect the <br /> 436 surrounding land or development of the site on which the mining is being conducted,and the <br /> 437 route of trucks moving to and from the sites.A bond will be required for restoration <br /> 438 (2) Soil processing.The operation of processing of sand,gravel or other material mined from <br /> 439 the land shall be permitted only by interim use permit.Such permit shall include a site plan <br /> 440 where the processing is to be done,showing the location of the plant,disposal of water,route <br /> 441 of trucks moving to and from the site in removing processed material from the site,the <br /> 442 condition in which the site is intended to be left upon completion, hour of operation;and <br /> 443 such permit shall not be granted for a period of longer than 12 months <br /> 444 (3) Creation of an engineered grade for the basis of building height determination outside of a <br /> 445 subdivision. <br /> 446 (4) Unless included as part of a permitted project, the following activities require a separate <br /> 447 Interim Use Permit. <br /> Activity Location • [Formatted Table <br /> 10 or More Cubic <br /> Yards or 1000 or <br /> more sq ft,unless More than 50 More than 50 <br /> part of a plan to Cubic Yards or Cubic Yards or <br /> address slope disturbing more disturbing more <br /> Grading failure. than 5000 sq ft than 5000 so ft <br /> Import/Export More than 500 CY More than 500 CY More than 1000 C`f Commented[JB181:If import of material exceeds 500 cy <br /> is necessary to repair slope failure,an IUP(6 weeks)is <br /> required. <br /> Stockpiling more Stockpiling more Stockpiling more <br /> Stockpiling than 90 days than 180 days than 180 days <br /> Page 112 February 18,2020 <br />