Laserfiche WebLink
From: Jason D Gottfried <br /> To: Jeremy Barnhart <br /> Cc: Robert H.Byers <br /> Subject: RE: [External]Subdivisions proposed in Orono <br /> Date: Tuesday,January 28,2020 2:29:50 PM <br /> Attachments: imaae001.onq <br /> Hello Jeremy, <br /> We discussed both items in our plat review committee mtg today(01/28) and offer the following <br /> preliminary thoughts for your team's consideration: <br /> CSAH 15(Carman St Parcels) <br /> • If the watershe• oncludes there ,elopable land here,our 1st <br /> recommendation w• • pursue an .sement to the east (commercial <br /> parcel). With the high . -s and 4,000 vehicles per day along this segment <br /> of Shoreline Dr we need . •ir s when we can. If an easement proves not <br /> to be a viable option, will n: - two sites into one shared access. <br /> • Access should be between d the existing remnant curb cut app. 20'to the <br /> east. Most importantly woul• ; adequate sight distance and maintaining a <br /> positive offset for opposin• B left turns @ Navarre) as we recently <br /> restriped (2019 overlay , en hared center left-turn lane <br /> • Driveway needs to h, anding t• •r optimal sight distance <br /> • Need to have site oid need for . • ing walls along Shoreline Dr <br /> • If/when replatti► -ly would request ay dedication to match a 45' half <br /> section (33' half ROW today). <br /> • Please submit a drainage report when available <br /> CSAH 6(1485 6th Ave N) <br /> • Access is okay as is(pending verification of adequate sight distance) <br /> • When replatting we likely would request a 50' half right-of-way section (33' half today) +a <br /> 10' D+U easement <br /> • For drainage pipe under CSAH 6,that empties into the lake on the west end of the <br /> subdivision plat, ensure adequate easement exists or can be dedicated to allow sufficient <br /> space for maintenance <br /> • We request the gravel driveway on the east side of the lake be removed (appears this is <br /> no longer needed?) <br /> • Ensure an access easement covers all three existing parcels served by the driveway <br /> • Please submit a drainage report when available <br /> Thank you Jeremy for bringing these items to our attention early on in the process. Please keep us <br /> involved should either item continue to move forward <br /> Jason <br /> Jason Gottfried <br /> Transportation Planner <br />