Laserfiche WebLink
Plan Review Checklist for New Structures / Additions <br /> Address/ PID / Legal: 133S W IN✓J 7•p M tcs&e 4, LAN`s <br /> Description of work: PA CZ T,rc,- B A 5 L n i F,N i S 1-1 <br /> Septic review by: ei(,t Date Approved: <br /> Zoning review by: /J( Date Approved: <br /> Building review by: c-ext 6LA,41,— Date Approved: Y' 24 •(r) <br /> Grading review by: NSA Date Approved: <br /> oning File#: Resolution #: Resolution Date: <br /> Zoning District Fire Department Post Office Sc• •of District <br /> I <br /> Zonin•• Lot Area: SF /AC Width: Depth: <br /> Survey bmitted: ❑ Yes ❑ No Date of Survey: <br /> Proposed Stbacks: <br /> Front(Lake Rear(Street) ( N S E W ) ( N S E W Other Buildings Wetland <br /> Side Side <br /> Building Defined Heig,t: Building Peak H:...ht: <br /> FOR A BUILDING WITH A BA EMENT OR CRAWL SPACE: F•- A BUILDING ON A SLAB FOUNDATION: <br /> START the distanc_ between the basement floor/ START the distance between the slab and the <br /> WITH crawl space •eor and the highest roof peak, WITH highest roof peak, the top of the cornice <br /> the top of the crnice of a flat roof, the deck of a flat roof, the deck line of a mansard <br /> line of a mansar• oof, or the uppermost roof, or the uppermost point on a round or <br /> point on a round o •ther arch-type roof other arch-type roof <br /> SUBTRACT half the distance be '-en the highest SUBTRACT half the distance between the highest <br /> window and highest ro• peak of a pi • ed window and highest roof peak of a <br /> roof pitched roof <br /> SUBTRACT the distance between the b:sem: t floor/ ADD the distance between the slab and the <br /> crawl space floor and the hig' -:t existing highest existing grade within the <br /> grade within the foundation o $ feet, foundation <br /> whichever is less. EQUALS Defined building height <br /> EQUALS Defined building height <br /> Lot Coverage: SF <br /> Shoreland District CWD Permit Received Average Lakeshore Setback Bluff <br /> Yes No ❑ N/A 0Yes 0 No❑ Yes — <br /> ❑ Yes ❑ No ❑ N/A►Pemt Number: <br /> Setback: <br /> Hardcover Zones Existing Proposed ariance Required CUP Required <br /> 0-75' 0 Ye- 0 No 0 Yes 0 No <br /> 75-250' Type(s): Type(s): <br /> 250-50$ <br /> 500-1 $0' <br /> REMAR : (in-house): <br /> Updated: 07/01/2009 <br /> z:\forms\plan review checklist.docx <br />