Laserfiche WebLink
The manifold and supply line pipe must have back drainage to the pumping chamber. <br /> The distribution pipes shall have their ends capped. Be sure the rock and sand fill <br /> material are clean. The sod layer below the entire mounded area must be turned over, <br /> just break up the sod, be sure not to over work. <br /> All neighboring wells are located greater than 100' away from the proposed treatment <br /> area. <br /> Keep all heavy equipment off of the proposed treatment area before and after <br /> construction. The treatment area should be marked off before construction. This <br /> Design is not valid & the system will need to be relocated if failure to protect the areas <br /> proposed for On-Site Sewage Treatment occurs. <br /> With proper installation and maintenance, this system should have no problem in <br /> treating septic effluent effectively. <br /> Nothing other than human waste, toilet tissue, laundry, showers, water softener etc. <br /> should be disposed of into the septic tanks. Iron filters must be diverted out of the <br /> system. Recommend to divert the water softner also. Garbage disposals are not <br /> recommended, due to adding more solids & fine solids passing through to the system. <br /> Excessive amounts of soaps, antibacterial soaps, cleaning agents, shower cleaners <br /> used every shower & chlorine agents may kill the bacteria needed to treat septic <br /> effluent. Additives are not recommended. Recommend to pump & clean your tanks <br /> through the manhole by a certified pumper every 2 years. Check with your pumper to <br /> set up a schedule. <br /> Steven B. Schirmers <br /> 2 <br />