Laserfiche WebLink
• <br /> CITY OF ORONO SEPTIC SYSTEM PERMIT APPLICATION <br /> Box 66 (2750 Kelley Parkway) <br /> Crystal Bay,Mn 55323 <br /> jj � <br /> JOB SITE ADDRESS //� ( IA : �G�b `6,, < R e7 <br /> Occupancy Type: Residential Commercial Other! <br /> Permit Type: New or Replacement System $100.00 �C <br /> Repair Existing System $ 50.00 <br /> (Tanks or Drainfield) <br /> $0.50 State surcharge added to above fees <br /> * See fee schedule for non-residential permit fees <br /> rn r (•c w ,`?l <br /> Owner's Name:/v ae l4.,c yPhone Number '95-2} `� `?3 -J 2 �J <br /> Mailing Address: 1/6 I k R-" City:C..9rc--1o. Zip: <br /> Contractor's Name: C(,„r 3 . P . Co. Phone Number: 26.V 9 9'L- 9,-e:('“,•. <br /> Mailing Address: 5912( 0,, S_6 City: Oc(a.o.‘' Zip: S3 2g. <br /> *** DO NOT MAIL, PAYMENT WITH THIS APPLICATION*** <br /> GENERAL INSTRUCTIONS <br /> 1. Applications for septic system permits may be mailed or submitted in person at the City <br /> Offices; however, permits will not be mailed out. The permit must be picked up in person <br /> at the City Offices and work must not begin unless the permit card is on the job site. <br /> 2. Permits will be issued only to contractors holding a Minnesota Pollution Control <br /> Agency(MPCA) Septic System Installers License. <br /> 3. All work must be done in accordance with the approved septic system design. Design reports <br /> are not considered approved unless accompanied by the "City of Orono Septic System <br /> Approval" cover sheet signed by the City Inspector. <br /> 4. The following inspections will be required for all septic systems: <br /> A. Pre-installation site inspection to include inspector, installer, and general contractor. <br /> B. Tank installation prior to covering. <br /> C. Drainfield trench installation prior to covering. For mounds, inspection is required after <br /> rough up but prior to sand placement (sand will be jar tested for silt content), and again <br /> during pressure distribution piping installation in the rock bed. <br /> D. Final inspection to verify proper final cover depths and to verify that all pump stations <br /> (where required) components are functional and comply with codes. <br /> 5. Individual holding MIPCAInstallers License shall be present during all inspections. A 24-hour <br /> notice is required for all inspections. <br />