Laserfiche WebLink
MAR-04-2005 17 08 P.02/06 <br /> Minnehaha Creek 1.4t, Watershed District <br /> Improving Quality of Water, Quality of Life <br /> Established in 1967 <br /> March 4, 2005 <br /> Brenshell Homes <br /> The Minnehaha Creek Attn:Joe Gutekunst <br /> 4052 Oakland St <br /> Watershed District is St Bonifacius, MN 55375 <br /> committed to a Re; MCWD Permit Application#05-076: 945 Willow View Dr, Orono <br /> leadership role in <br /> Dear Mr. Gutekunst: <br /> protecting,improving, <br /> As per the enclosed Stop-Work Order that was issued today by MCWD Staff on permit <br /> and managing the application#05-076 for 945 Willow View Dr, Orono, today March 4, 2005,the following <br /> surface waters and corrections are required to bring your site into full compliance: <br /> affiliated groundwater 1. Complete permit application and obtain permit by submitting the following <br /> information: <br /> resources within the • Combined Joint Notification Form completed with original <br /> signature on both the first and second page. The applicant <br /> District,including their must be the current property owner. <br /> relationships to the • Submit a site plan with the wetland and wetland buffer <br /> indicated and clearly labeled, as approved on the subdivision <br /> ecosystems of which they plan. <br /> • A declaration for the preservation of wetland buffers, correctly <br /> are an integral part, recorded and executed with Hennepin County. <br /> through regulation, • A permanent site stabilization plan. Plan must include the <br /> addition of 4 inches of topsoil to all disturbed areas and <br /> capital projects, manor/method of establishing permanent vegetative cover <br /> (sod, hydroseed and mulch, etc). <br /> education,cooperative Please note that submission of application material does not guarantee permit <br /> endeavors,and other issuance and may result in a request for additional information. <br /> 2. Move large soil clods along southern silt fence, adjacent to trail,to a contained <br /> programs based on area(within silt fence), and repair resulting damage to silt fence. <br /> 3. Clean excess sediment from street. <br /> sound science, 4. Mulch or provide other cover to small topsoil berm that follows outside of silt <br /> fence. If berm is in fact compost, make sure compost is seeded. <br /> innovative thinking,an 5. Install rock construction entrance. <br /> informed and engaged As a reminder, no work is to occur on site other than to deliver construction materials and <br /> constituency,and the to correct erosion and sediment control measures until the Stop-Work Order has been <br /> lifted. In addition, Brenshell Homes will be billed for all staff time and expenses <br /> cost effective use ofpublic associated with the Stop-Work Order once lifted and all corrections are in place. For <br /> deadlines for making required corrections and violations hearing times, please see the <br /> funds. enclosed Stop-Work Order. <br /> if you have any questions, I can be reached at 952-471-0590. <br /> incerely, 14^ <br /> 1./ trovL__ <br /> Jane M Byron <br /> District Representative <br /> Cc: Lyle Oman, City of Orono <br /> Enclosed: Stop-Work Order for 945 Willow View Dr issued 03/04/05 <br /> Copy of 02/24/05 application status letter <br /> 18202 Minnetonka Boulevard,Deephaven tP11 1fiR9JoirtPketrifRtilt3h( irrf Fax 952-471-0682 • www.minnehahacreek.arg <br />