My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-2004 - MCWD erosion control permit
Orono
>
Property Files
>
Street Address
>
W
>
Willow View Drive
>
0865 Willow View Drive - 28-118-23-44-0005
>
Permits/Inspections
>
2003-2004 - MCWD erosion control permit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:25:58 PM
Creation date
2/14/2020 9:31:49 AM
Metadata
Fields
Template:
x Address Old
House Number
865
Street Name
Willow View
Street Type
Drive
Address
865 Willow View Drive
Document Type
Permits/Inspections
PIN
2811823440005
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JUL-16-2004 10 52 P.03/04 <br /> Existing owner information: <br /> For the purposes r-.f r is form the" ".ring owner"will refer Thy erson or party wishing to transfer the permit. <br /> Name(last, ftrst, MI) G• J"1/ <br /> Comp„Name(if applicable) <br /> 'ie..�.c,,l !�/��l Uk • ��J 0/ ,w, Pr <br /> - <br /> Address (Street, RFD, Box#, City State.Zip) _ cam- Cc , <br /> Phone Number(include arca code)/Email Address(if avail. ,le)/Fax.Number(if available) <br /> 2. The following information must be given to the New Owner for review prior to permit transfer application: <br /> • Copy of the MCWD approved erosion control plan under the existing permit. <br /> • MCWD-supplied Fact sheet on Sediment and Erosion Control. <br /> 3. All approved/required erosion and sediment control measures indicated on the MCWD approved erosion control <br /> plan must be installed and functioning according to MCWD approved standards prior to permit transfer <br /> application. <br /> 4. I understand that permit transfer is not complete until the new owner has received a permit,and that until such time <br /> that permit tjansfer is complete, I am the party responsible for implementing and following the conditions of the <br /> permit. /l[.1 <br /> tnical <br /> 5. I understand that submission of this application does not guarantee permit transfer and more information may be <br /> requested. I hereby certify that to the best of my knowledge and belief all information contained in this document <br /> and accompanying attachments are true,complete,and accurate. i am aware that there are significant penalties for <br /> submittin else i prmati <br /> 6-- 21' 0 <br /> Exi Own kens Date <br /> For Office Use Only <br /> Approved By: Title: District Technician, <br /> Date of Issuance: Date of E piration: <br /> Based on Plans Received on: <br /> Conditions <br /> • The'permit holder is respdmsi ile for;corn liance With all.MCWD Rules and for the action(s)of their <br /> representatives,, pontradtors,and employees, <br /> • All erosion and sediment control measures must be effectively installed and maintained according to <br /> MCWD guidelines as laid out by current I3istrict Rules artd.Policies until all disturbed soils are <br /> peri»atnently stabilized- ' <br /> • <br /> • All temporary erosion and sediment control measures must be removed following final inspection by <br /> MCWD Staff after all disturbed soils have been permanently stabilized. <br /> • District staff or their representatives may enter lots for the purposes of enforcing and determining <br /> compliance with District Rules. <br /> • MCWD may charge fees folr actual time for inspections,legal services, monitoring,analysis, and any <br /> supporting work according to the current MCWD Fee Schedule which may be subject to change. <br /> • <br /> Page 2 of 2 <br /> rr? QgWnk 111HSNR S 89STSPOZS6 Sb=0I b00Z/90/LB <br />
The URL can be used to link to this page
Your browser does not support the video tag.