Laserfiche WebLink
1 <br /> ''.4itv 0.11i. <br /> O 0 <br /> 4(4,, CITY of ORONO <br /> "�� INAt �~' RESOLUTION OF THE CITY COUNCIL <br /> %/A- 04� NO. 4 . N R <br /> issuance of building permits for home construction. <br /> Final Plat Submittals: <br /> The following list of final submittals must be submitted to the Zoning Administrator two <br /> weeks prior to the regularly scheduled Council meeting on the second and fourth Mondays of <br /> the month. These submittals are as follows: <br /> 1. Record plat drawings in the form of two (2) mylar copies (one copy for the <br /> City's records and one for filing with Hennepin County) and one (1) copy <br /> reduced to 1" = 200'. Drawing to include: <br /> a. Lot lines platted per preliminary survey by Martin P. Campion of Otto <br /> Associates Engineers and Land Surveyors, Inc. dated December 3, 1999. <br /> b. Dedication of drainage and utility easements 10' wide along the exterior <br /> boundaries of property and 5' along the internal lot lines. <br /> c. Designation and dedication of drainage easements over detention ponds <br /> and drainageways as shown on preliminary grading, drainage and erosion <br /> control plan. <br /> d. Designation of Outlot A to serve as a private roadway. <br /> e. The naming of plat as Willow View. <br /> 6. Designation and dedication of trail easements over the conservation <br /> outlot, Outlot A and between lots 7 and 8, Block 1. <br /> 7. Copy of protective covenants. <br /> 2. Legal documents required: <br /> a. Title opinion addressed to the City. All owners, mortgage holders or <br /> others with property interest indicated therein shall sign the plat and all <br /> other documents affected by such interest. <br /> b. The applicant must provide certified copies of all recorded easements <br /> Page 8 of 11 <br />