Laserfiche WebLink
-.. , OSTP Basic Pump Selection Design UNIVERSITY . .. <br /> Minnesota Pollution "'r <br /> Control Agency NNor sheet OF MINNESOTA ''t_\ <br /> 1. PUMP CAPACITY Project ID: v 06.12.13 <br /> Pumping to Gravity or Pressure Distribution: I 0 Gravity ®Pressure Selection required <br /> 1. If pumping to gravity enter the gallon per minute of the pump: GPM (10-45 gpm) <br /> 2. If pumping to a pressurized distribution system: 36.0 GPM <br /> 3. Enter pump description: <br /> 2. HEAD REQUIREMENTS s;oin;aa°;°harrge' <br /> - n- <br /> A. Elevation Difference 17 ft fr-^-y SUS„\1M��9rh <br /> between pump and point of discharge: <br /> nl tpipe^ Elevetbn%,, - <br /> B. Distribution Head Loss: 5 ft _-. .. _ difference <br /> •C. Additional Head Loss: ft(due to special equipment,etc) <br /> Table I rriction Loss in Plastic Pipe per 100ft <br /> Distribution Head Loss I Flow Rate Pipe Diameter(inches)_ <br /> Gravity Distribution = Oft p r - <br /> (GPM) __1 II 1.25 -1.5 4 2 <br /> Pressure Distribution based on Minimum Average Head 10 9.1 1 3.1 1.3 I 0.3 <br /> Value on Pressure Distribution Worksheet: 12 12,8 1 4.3 1.8 0.4 <br /> Minimum Average Head Distribution Head Loss 14 17.0 1 5.7 2.4 0.6 <br /> lit 5ft 16 21.8 7.3 3.0 1 0.7 <br /> 2ft 6ft 18 9.1 3.8 I 0.9 <br /> 5ft 10ft 20 11.1 4.6 1.1 <br /> 2516.8 6.9 1.7 <br /> D. 1.Supply Pipe Diameter: 2.0 in 30 ( 23.5 9.7 2.4 <br /> 35 12.9 3.2 <br /> 2.Supply Pipe Length: 75 ft 40 16.5 1 4.1 <br /> E. Friction Loss in Plastic Pipe per 100ft from Table I: 45 20.5 5.0 <br /> 50 6.1 <br /> Friction Loss= 3.32 ft per 100ft of pipe 55 7.3 <br /> 60 8:6 <br /> F. Determine Equivalent Pipe Length from pump discharge to soil dispersal area discharge 6510.0 <br /> point. Estimate by adding 25%to supply pipe length for fitting loss. Supply Pipe Length 70 1, , 11.4 <br /> (D.2) X 1.25=Equivalent Pipe Length 75 I 13.0 <br /> 85 16.4 <br /> 75 ft X 1.25 = 93.8 ft 95 20.1 <br /> G. Calculate Supply Friction Loss by multiplying Friction Loss Per 100ft (Line E)by the Equivalent Pipe Length (Line F)and divide by 100. <br /> Supply Friction Loss= <br /> 3.32 ft per 100ft X 93.8 ft + 100 = 3.1 ft <br /> H. Total Head requirement is the sum of the Elevation Difference (Line A),the Distribution Head Loss(Line B),Additional Head Loss(Line C),and the <br /> Supply Friction Loss(Line G) <br /> 17.0 ft + 5.0 ft + ft + 3.1 ft = 25.1 ft <br /> 3. PUMP SELECTION <br /> A pump must be selected to deliver at least 36,0 GPM(Line 1 or Line 2)with at least 25.1 feet of total head. <br /> Comments: <br />