My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014 - 00702 - septic new
Orono
>
Property Files
>
Street Address
>
W
>
Willow Hill Drive
>
2360 Willow Hill Drive - 03-117-23-23-0023
>
Permits/Inspections
>
2014 - 00702 - septic new
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:35:43 PM
Creation date
2/13/2020 9:47:47 AM
Metadata
Fields
Template:
x Address Old
House Number
2360
Street Name
Willow Hill
Street Type
Drive
Address
2360 Willow Hill Dr
Document Type
Permits/Inspections
PIN
0311723230023
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. DISTRIBUTION MEDIA: REGISTERED TREATMENT PRODUCTS: CHAMBERS AND EZFLOW <br /> A. Enter Dispersal Media: <br /> B. Enter the Component Length: ft Enter the Component Width: ft <br /> C. Number of Components per Row=Bed Length divided by Component Length (Round up) <br /> ft : ft= components/row <br /> D. Actual Bed Length = Number of Components/row X Component Length: <br /> components X ft = ft <br /> E. Number of Rows=Bed Width divided by Component Width (Round up) <br /> ft s ft= rows Adjust width so this is on whole number. <br /> F. Total Number of Components= Number of Components per Row X Number of Rows <br /> X = components <br /> 6. MOUND SIZING <br /> A. Calculate Minimum Clean Sand Lift: 3 feet minus Depth to Limiting Condition =Clean Sand Lift <br /> 3.0 ft - 2.0 ft = 1.0 ft Design Sand Lift(optional): ft <br /> B. Calculate Upslope Height: Clean Sand Lift + media depth +cover(1 ft.) =Upslope Height <br /> 1.0 ft + 1.0 ft + 1.0 ft= 3.0 ft <br /> C. Select Upslope Berm Multiplier(based on land slope): 3.57 <br /> Land Slope% 0 1 2 3 4 5 6 7 8 9 10 11 12 <br /> Upslope Berm 3:1 3.00 2.91 2.83 2.75 2.68 2.61 2.54 2.48 2.42 2.36 2.31 2.26 2.21 <br /> Ratio 4:1 4.00 3.85 3.70 3.57 3.45 3.33 3.23 3:12 3.03 2:94 2.86 2.78 2,70 <br /> D. Calculate Upslope Berm Width: Multiplier X Upslope Mound Height = Upslope Berm Width <br /> 3.57 ft X 3.0 ft = 11.0 ft <br /> E. Calculate Drop in Elevation Under Bed: Bed Width X Land Slope y 100=Drop (ft) <br /> 10.0 ft X 3.0 % = 100= 0.30 ft <br /> F. Calculate Downslope Mound Height: Upslope Height+Drop in Elevation =Downslope Height <br /> 3.0 ft + 0.30 ft = 3.3 ft <br /> G. Select Downslope Berm Multiplier(based on land slope): 4.54 <br /> Land Slope% 0 1 2 3 4 5 6 7 8 9 10 11 12 <br /> Downslope 3:1 3.00 3.09 3.19 3.30 3.41 3.53 3.66 3.80 3.95 4.11 4.29 4.48 4.69 <br /> Berm Ratio 4:1 '4.00 4.17 4.35 4.54 4.76 5.00 5.26 5.56 5.88 6.25 6,67 7.14 7.69 <br /> H. Calculate Downslope Berm Width: Multiplier X Downslope Height =Downslope Berm Width <br /> 4.54 x 3.3 ft = 15.0 ft <br /> I. Calculate Minimum Berm to Cover Absorption Area: Downslope Absorption Width +4 feet <br /> 10.0 ft + 4 ft = 14.0 ft <br /> J. Design Downslope Berm=greater of 4H and 41: 15.0 ft <br /> K. Select Endslope Berm Multiplier: 3.00 (usually 3.0 or 4.0) <br /> L. Calculate Endslope Berm X Downslope Mound Height =Endslope Berm Width <br /> 3.00 ft X 3.3 ft = 10.0 ft <br /> M. Calculate Mound Width: Upslope Berm Width + Bed Width + Downslope Berm Width <br /> 11.0 ft + 10.0 ft + 15.0 ft = 36.0 ft <br /> N. Calculate Mound Length: Endslope Berm Width + Bed Length + Endslope Berm Width <br /> 10.0 ft + 63.0 ft + 10.0 ft = 83.0 ft <br />
The URL can be used to link to this page
Your browser does not support the video tag.