My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012 - Development Agreement
Orono
>
Property Files
>
Street Address
>
W
>
Willow Hill Drive
>
2325 Willow Hill Dr - 03-117-23-23-0022
>
Misc
>
2012 - Development Agreement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:35:39 PM
Creation date
2/13/2020 9:17:06 AM
Metadata
Fields
Template:
x Address Old
House Number
2325
Street Name
Willow Hill
Street Type
Drive
Address
2325 Willow Hill Dr
Document Type
Misc
PIN
0311723230022
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
rules and regulations. DNR regulations regarding appropriations permits.shall also be strictly <br /> followed. <br /> 12. TIME OF PERFORMANCE. The Developer shall install all Improvements as <br /> contemplated by Section 8 and the approved Plans by November 30, 2012, with the exception of <br /> the final wear course of asphalt on streets. The final wear course on streets shall be installed <br /> between August 15th and September 15th the first summer after the base layer of asphalt has been in <br /> place one freeze thaw cycle. The Developer may, however, request an extension of time from the <br /> City. If an extension is granted, it shall be conditioned upon updating the "security"to reflect cost <br /> • increases and extended completion date. Final wear course placement must have the written <br /> approval of the City Engineer,and may be delayed or scheduled at any time of the year based upon <br /> existing site conditions at the discretion of the City Engineer. <br /> 13. LICENSE. The Developer hereby grants the City, its agents, employees, officers <br /> and contractors a license to enter the Land to perform all work and inspections deemed appropriate <br /> by the City in conjunction with development of the Land. • <br /> 14. EROSION CONTROL. Prior to initiating site grading,the storm water pollution <br /> prevention plan, and the erosion control plan, Plan B, shall be implemented by the Developer and <br /> inspected and approved by the City. The City may impose additional erosion control requirements <br /> if reasonably required. All areas disturbed by excavation and backfilling operations shall be <br /> reseeded within five (5) days after the completion of the work, weather permitting, or in an area <br /> that is inactive for more than ten (10) days unless authorized and approved by the City Engineer. <br /> Except as otherwise provided in the erosion control plan, seed shall be in accordance with the <br /> City's current seeding specification which may include certified oat seed to provide a temporary <br /> ground cover as rapidly as possible. All seeded areas shall be fertilized, mulched, and disc <br /> Page 5 of 22 <br /> 1651o1v2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.