My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012 - Development Agreement
Orono
>
Property Files
>
Street Address
>
W
>
Willow Hill Drive
>
2325 Willow Hill Drive - 03-117-23-23-0022
>
Misc
>
2012 - Development Agreement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:35:39 PM
Creation date
2/13/2020 9:17:06 AM
Metadata
Fields
Template:
x Address Old
House Number
2325
Street Name
Willow Hill
Street Type
Drive
Address
2325 Willow Hill Dr
Document Type
Misc
PIN
0311723230022
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
G. All of the proposed lots must contain suitable area meeting all established <br /> setback requirements to allow the construction of single family residences. <br /> H. The Developer must obtain a sign permit from the City Building Official <br /> prior to installation of any subdivision identification signs for the Land. The City sign ordinance <br /> allows temporary subdivision identification signs on corner lots provided the signs meet area, <br /> height, and setback requirements, and provided the Developer submits a $1,000.00 per sign <br /> security guaranteeing sign removal when the subdivision is fully developed. <br /> I. Prior to City Council approval of the final Plat, the Developer shall furnish <br /> a boundary survey of the Land with all property corner monumentation of the Land in place and <br /> marked with lath and a flag. Any encroachments on or adjacent to the Land shall be noted on the <br /> survey. The Developer shall post a $300.00 security (the "Monument Security") for the final <br /> placement of interior subdivision iron monuments at property corners and the placement of all <br /> monuments pursuant to 1066. The Monument Security was calculated as follows: 3 Iots at <br /> $100.00 per lot. The Monument Security will be held by the City until the Developer's land <br /> surveyor certifies that all irons have been set following site grading and utility and street <br /> construction. In addition,the certificate of survey must also include a certification that all irons for <br /> a specific lot have either been found or set prior to the issuance of a building permit for that lot. <br /> J. The Developer shall pay to the city engineer the amounts incurred for the <br /> preparation of record construction drawings and City base map upgrading. <br /> K. The Developer shall submit the final Plat in electronic format. The <br /> electronic format shall be Auto CAD file. The Developer shall also submit two complete sets of <br /> the Plat on Mylar (one copy for the City's records and one copy for recording with Hennepin <br /> County). The Developer shall also provide one copy reduced to 1"=200'. <br /> Page 11 of 22 <br /> 165101v2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.