Laserfiche WebLink
OSTP Pressure Distribution <br /> UNIVERSITY1' <br /> Minnesota Pollution Design Worksheet OF MINNESOTA • <br /> Control Agency �.�� . <br /> 1. Select Number of Perforated Laterals in system/zone: 3w d ceoeel;� ( I <br /> a emieem ��-,t,.- Minimum�i';'►,�., -',,'-'..,'J_.''.,'. <br /> (2 feet is minimum and 3 feet is maximum spacing) '/< perforations spaced 3 apart K?';a 2 of rock-`y ' <br /> 2. Select Perforation Spacing: ; ' �{; )? <br /> f Pa g 3.0 ft a , Y, R, � , <br /> 3. Select Perforation Diameter Size 7132 inch Perforation sizing:I. to'I." <br /> Perforation spacing:2'to 3' <br /> 4. Length of Laterals =Media Bed Length-2 Feet. Perforation can not be closer then 1 foot from edge. v 11.05.31 <br /> 63 - 2ft = 61 ft <br /> 5- Determine the Number of Perforation Spaces. Divide the Length of Laterals (Line 4)by the Perforation Spacing (Line 2)and <br /> round down to the nearest whole number. <br /> Number of Perforation Spaces = 61 ft - 3 ft = 20 Spaces <br /> 6. Number of Perforations per Lateral is equal to 1.0 plus the Number of Perforation Spaces (Line 5). <br /> Perforations Per Lateral = 20 Spaces + 1 = 21 Perfs.Per Lateral <br /> Check table below to verify the number of perforations per lateral guarantees less than a 10%discharge variation. The value is <br /> double if the a center manifold is used. <br /> Maximum Number of Perforations Per Lateral to Guarantee.1096 Discharge Variation <br /> V.Inch Perforations 7/32 Inch Perforations <br /> Pipe Diameter(Inches) Perforation Spacing Pipe Diameter(Inches) <br /> Perforation Spacing(Feet) I <br /> t 114 11/2 2 3 (Feet) 1 11/4 112 2 3 <br /> 2 10 13 18 30 60 2 11 16 21 34 68 <br /> 212 8 12 16 28 54 212 10 14 20 32 64 <br /> 3 8 12 16 25 52 3 9 14 19 30 60 <br /> 3/16 Inch Perforations 1/8 Inch Perforations , <br /> 1 Pipe Diameter(inches) Perforation Spacing Pipe Diameter(Inches) <br /> Perforation Spacing(Feet) 1 114 112 2 3 (Feet) 1 114 11 2 3 <br /> 2 12 18 26 46 87 2 21 33 44 74 149 <br /> 212 12 17 24 40 80 21 20 30 41 69 135 <br /> 3 12 16 22 37 75 3 20 29 38 64 128 <br /> 7- Total Number of Perforations equals the Number of Perforations per Lateral (Line 6)multiplied by the Number of <br /> Perforated Laterals (Line 1). <br /> 21 Perf. Per Lateral X 3 Number of Perf. Laterals = 63 Total Number of Perf. <br /> 8. Calculate the Square Feet per Perforation. Recommended value is 4-10 ft 2 per perforation. Perforation Discharge(0F) <br /> Does not apply to At-Grades Perforation Diameter <br /> Mead(rt) ,/. ',,. 7,.,t '/. <br /> Bed Area = Bed Width(ft)X Bed Length(ft) ,.o• 0.18 0.41 0.56 0.74 <br /> 1.5 0.22 0.51 0.69 0.9 <br /> 10 ft X 63 ft = 630 ft2 zoo 0.26 0.59 0.80 1.04 <br /> 2.5 0.29 0.65 0.89 1.17 <br /> 3.0 0.32 0.72 0.98 1.28 <br /> Square Foot per Perforation =Bed Area divided by the Total Number of Perforations (Line 7). 4.0 0.37 0.83 1.13 1.47 <br /> 5.0' 0.41 0.93 1.26 1.65 <br /> j Dwellings with 3/t6 inch to 114 inch <br /> 630 ft - 63 perforations = 10.0 ft2/perforations 'foot perforaclom <br /> Dwellings with I/8 inch perforations <br /> 2 feet Other establishments and MSTS with 1/16 <br /> 9. Select Minimum Average Head: 1.0 ft inch to 1/4 inch perforations <br /> 5 feet Other establishments and MSTS with lig inch <br /> perforations <br /> 10. Select Perforation Discharge (GPM)based on Table III: 0.56 GPM per Perforation <br /> 11- Determine required Flow Rate by multiplying the Total Number of Perforations (Line 7)by the Perforation Discharge (Line 10). <br /> 63 Perforations X 0.56 GPM per Perforation = 36 GPM <br />