My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013 - 00685 - septic
Orono
>
Property Files
>
Street Address
>
W
>
Willow Hill Drive
>
2325 Willow Hill Dr - 03-117-23-23-0022
>
Septic
>
2013 - 00685 - septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:35:40 PM
Creation date
2/13/2020 8:58:06 AM
Metadata
Fields
Template:
x Address Old
House Number
2325
Street Name
Willow Hill
Street Type
Drive
Address
2325 Willow Hill Dr
Document Type
Septic
PIN
0311723230022
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1325 W 1wIli 1ITX <br /> Rusty Olson's--Soil and Percolation Testing <br /> Joseph J. Olson--MPCA License #810 <br /> 11481 Riverview Rd. NE, Hanover, MN 55341 <br /> (763) 498-8779 fax (763) 498-8290 <br /> September 22,2011 <br /> Arthur J.Nelson Estate. <br /> Proposed Lot 1 <br /> Orono,Hennepin County <br /> This on-site Sewage Treatment System is partially designed for a Type 1,five-bedroom home in <br /> accordance with the Minnesota Pollution Control Agency Chapter 7080 and local ordinances. <br /> Once the house size and location are chosen this design can be completed. <br /> The periodically saturated soils were located at 20-28 inches below grade(mottled soil).Due to the <br /> periodically saturated soils,a pressurized mound system will need to be installed to treat the septic effluent. <br /> The bottom of the treatment area must be located at least 3'above the saturated soils. <br /> The soils at a depth of 12"have a percolation rate averaging 6 MPI. <br /> The absorption areas do not overlap. <br /> Use 7/32 inch perforations must be used on the laterals. <br /> All tanks need to be insulated if there is less than two feet of cover over the top of the tanks.A filter needs <br /> to be installed on the second tank.Clean outs must be installed on the end of the laterals for maintenance. <br /> A pumping chamber will need to be installed to lift the effluent to the treatment area. The power supply <br /> and switches must be located outside the manhole and pumping chamber in a weatherproof enclosure. A <br /> warning device must be installed with a light and sound device;this is in case of a pump failure. <br /> Keep all heavy equipment off of the proposed treatment areas before and after construction.The <br /> treatment area must be fenced off before construction begins.This Design is not valid&the System <br /> will need to be relocated if failure to protect the areas proposed for the On-Site Sewage Treatment <br /> systems occurs. <br /> Nothing other than gray water,(laundry,showers,ect.)human water&toilet tissue should be <br /> disposed of into the septic tanks.Garbage disposals are not recommended.Additives must not be <br /> used;they may cause harmful damage to your septic system.It is recommended that you pump the <br /> septic tanks every two years. <br /> Sincerely, <br /> CITY OF ORONO <br /> SETIC PE/�L N EV� <br /> IINSPECTOROR <br /> Joseph J.Olson DATE If PERMIT NO. <br /> APPROVED AS SUBMITTED <br /> 0 APPROVED WITH CORRECTION'S AS NOTED <br /> NOT APPROVED-CORRECT&RESUBMIT <br /> These comments are for your information. All work shall be dory <br /> SIS SYSTEM IS DESIGNED FOR <br /> in full compliance with all applicable septic and zoning code. <br /> BEDROOMS. ANY INCREASE IN NUMBER <br /> DALES THIS DESIGN. Requirements including items not specifically noted in this review. <br /> BEDROOMS INYAU KELP THIS PLAN SET ON SITE AT ALL TIMES <br />
The URL can be used to link to this page
Your browser does not support the video tag.