My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013 - 00685 - septic
Orono
>
Property Files
>
Street Address
>
W
>
Willow Hill Drive
>
2325 Willow Hill Dr - 03-117-23-23-0022
>
Septic
>
2013 - 00685 - septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:35:40 PM
Creation date
2/13/2020 8:58:06 AM
Metadata
Fields
Template:
x Address Old
House Number
2325
Street Name
Willow Hill
Street Type
Drive
Address
2325 Willow Hill Dr
Document Type
Septic
PIN
0311723230022
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OSTP Pressure Distribution <br /> UNIVERSITY <br /> Minnesota Pollution Design Worksheet OF MINNESOTA , t_,. <br /> Control Agency ,, <br /> I I <br /> 1. Select Number of Perforated Laterals in system/zone: 3 �q4Gveot 'k <br /> / 0M aj"•, Minimum i4.,,t g <br /> (2 feet is minimum and 3 feet is maximum spacing) (SI /t_perforations spaced 3 apart 4,2 of rock ,t::. <br /> 2. Select Perforation Spacing: 3.0 ft ',ti't•f, , , , , + .'° 12 <br /> 3. Select Perforation Diameter Size 732 inch <br /> Perforation sizing:'4"to V." <br /> Perforation spacing:2'to 3' <br /> 4. Length of Laterals =Media Bed Length-2 Feet. Perforation can not be closer then 1 foot from edge. v 11.05.31 <br /> 63 - 2ft = 61 ft <br /> 5. Determine the Number of Perforation Spaces. Divide the Length of Laterals (Line 4)by the Perforation Spacing (Line 2)and <br /> round down to the nearest whole number. <br /> Number of Perforation Spaces = 61 ft ÷ 3 ft = 20 Spaces <br /> 6. Number of Perforations per Lateral is equal to 1.0 plus the Number of Perforation Spaces (Line 5). <br /> Perforations Per Lateral = 20 Spaces + 1 = 21 Perfs. Per Lateral <br /> Check table below to verify the number of perforations per lateral guarantees less than a 10%discharge variation. The value is <br /> double if the a center manifold is used. <br /> Maximum Number of Perforations Per Lateral to Guarantee<10%Discharge Variation <br /> .Inch Perforations 7132 Inch Perforations <br /> IApe Diameter(Inches) Perforation Spacing Pipe Diameter(Inches) <br /> Perforation Spacing(Feet) 1 114 112 2 3 (Feet) 1 114 1st 2 3 <br /> 2 10 13 18 30 60 2 18 16 21 34 68 <br /> 212 8 12 16 28 54 212 10 14 20 32 64 <br /> 3 8 12 16 25 52 3 9 14 19 30 60 <br /> 3/16 Inch Perforations 1/8 Inch Perforations <br /> I <br /> Pipe Diameter(Inches) Perforation Spacing Pipe Diameter(Inches) <br /> Perforation Spacing(Feet) <br /> 1 114 11 2 3 (Feet) 1 1 t6 11,2 2 3 <br /> 2 12 18 26 46 87 2 21 33 44 74 149 <br /> 212 12 17 24 40 80 212 20 30 41 69 135 <br /> 3 12 16 22 37 75 3 20 29 38 64 128 <br /> 7. Total Number of Perforations equals the Number of Perforations per Lateral (Line 6)multiplied by the Number of <br /> Perforated Laterals (Line 1). <br /> 21 Perf. Per Lateral X 3 Number of Perf. Laterals = 63 Total Number of Perf. <br /> 8. Calculate the Square Feet per Perforation. Recommended value is 4-10 ft 2 per perforation. Perforation Discharge top") <br /> Does not apply to At-Grades p"`°ra"°n <br /> Diameter <br /> Head Pt) 1/r ,/i. '61 ,i <br /> • <br /> Bed Area = Bed Width(ft)X Bed Length(ft) ,,o- 0.18 0.41 0.56 0.74 <br /> 1.5 0.22 0.51 0.69 0.9 <br /> 10 ft x 63 ft = 630 ft2 2.0° 0.26 0.59 0.80 1.04 <br /> 2.5 0.29 0.65 0.89 1.17 <br /> 3.0 0.32 0.72 0.98 1.28 <br /> Square Foot per Perforation =Bed Area divided by the Total Number of Perforations (Line 7). 4.0 0.37 0.83 1.13 1.47 <br /> 5.0` 0.41 0.93 1.26 1.65 <br /> Dwellings with 3/16 inch to 1/4 inch <br /> 630 ft263 perforations = 10.0 ft2/perforations '`Dot perforations <br /> Dwellings with 1/a inch perforations <br /> 2 feet Other establishments and LASTS with 3/16 <br /> 9. Select Minimum Average Head: 1.0 ft inch to 1/4 inch perforations <br /> 5 feet Other establishments and MSTS with 1/8 inch <br /> perforations <br /> 10. Select Perforation Discharge (GPM)based on Table III: 0.56 GPM per Perforation <br /> 11. Determine required Flow Rate by multiplying the Total Number of Perforations (Line 7)by the Perforation Discharge (Line 10). <br /> 63 Perforations X 0.56 GPM per Perforation = 36 GPM <br />
The URL can be used to link to this page
Your browser does not support the video tag.