My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011 - Soil & Percolation Testing
Orono
>
Property Files
>
Street Address
>
W
>
Willow Hill Drive
>
2300 Willow Hill Dr - 03-117-23-32-0026
>
Septic
>
2011 - Soil & Percolation Testing
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:36:47 PM
Creation date
2/12/2020 1:31:01 PM
Metadata
Fields
Template:
x Address Old
House Number
2300
Street Name
Willow Hill
Street Type
Drive
Address
2300 Willow Hill Dr
Document Type
Septic
PIN
0311723320026
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ OSTP Pressure Distribution :- <br /> r 3 <br /> UNIVERSITY ,---7.1-.:,V <br /> Minnesota Pollution <br /> Design Worksheet OF MINNESOTA I <br /> Control Agency ,,� <br /> 1. Select Number of Perforated Laterals in system/zone: 3 Geote�ci� ( ( <br /> `J�'.'OV'-pu ^Sya-qv -pV -W'O� <br /> D� ��tD�►, Minimum�:►., ,�►.., s:. <br /> (2 feet is minimum and 3 feet is maximum spacing) M�h tlperforations spaced 3apart KS cMrj 2'of rock ?J: Jkit AJS !; <br /> 11 <br /> 2. Select Perforation Spacing: 3.0 ft ` <br /> 3. Select Perforation Diameter Size 7/32 inch Perforation sizing:'it'to'/: <br /> Perforation spacing:2'to 3' <br /> 4. Length of Laterals =Media Bed Length-2 Feet. Perforation can not be closer then 1 foot from edge. v 11.05.31 <br /> 63 - 2ft = 61 ft <br /> 5. Determine the Number of Perforation Spaces. Divide the Length of Laterals (Line 4)by the Perforation Spacing (Line 2)and <br /> round down to the nearest whole number. <br /> Number of Perforation Spaces = 61 ft ÷ 3 ft = 20 Spaces <br /> 6. Number of Perforations per Lateral is equal to 1.0 plus the Number of Perforation Spaces (Line 5). <br /> Perforations Per Lateral = 20 Spaces + 1 = 21 Perfs. Per Lateral <br /> Check table below to verify the number of perforations per lateral guarantees less than a 10%discharge variation. The value is <br /> double if the a center manifold is used. <br /> Maximum Number of Perforations Per Lateral to Guarantee.K10%Discharge Variation <br /> .'.Inch Perforations 7/32 Inch Perforations <br /> Perforation Spacing(Feet) I Pipe Diameter(Inches) Perforation Spacing Pipe Diameter(Inches) <br /> 1 116 11h 2 3 (Feet) t 114 11'2 2 3 <br /> 2 10 13 18 30 60 2 11 16 21 34 68 <br /> 21 8 12 16 28 54 21 10 14 20 32 64 <br /> 3 8 12 16 25 52 3 9 14 19 30 60 <br /> 3/16 Inch Perforations 1/8 Inch Perforations <br /> ' Pipe Diameter(Inches) Perforation Spacing Pipe Diameter(Inches) I <br /> Perforation Spacing(Feet) I <br /> 1 115 112 2 3 (Feet) I 115 11': 2 3 I <br /> 2 12 18 26 46 87 2 21 33 44 74 149 ; <br /> 2/ 12 17 24 40 80 21 20 30 41 69 135 <br /> 3 12 16 22 37 75 3 20 29 38 64 128 <br /> 7. Total Number of Perforations equals the Number of Perforations per Lateral (Line 6)multiplied by the Number of <br /> Perforated Laterals (Line 1). <br /> 21 Perf. Per Lateral X 3 Number of Perf. Laterals = 63 Total Number of Perf. <br /> 8. Calculate the Square Feet per Perforation. Recommended value is 4-10 ft 2 per perforation. Perforation Discharge 10°14) <br /> , <br /> ,"' <br /> Does not apply to At-Grades H.0aw(ft) ,,r J,,. "°'"""" <br /> . 'at ,% <br /> Bed Area = Bed Width (ft)X Bed Length(ft) ,.o• 0.18 0.41 0.56 0.74 <br /> 1.5 0.22 0.51 0.69 0.9 <br /> 10 ft X 63 ft = 630 ft2 2.0° 0.26 0.59 0.80 1.06 <br /> 2.5 0.29 0.65 0.89 1.17 <br /> 3.0 0.32 0.72 0.98 1.28 <br /> Square Foot per Perforation =Bed Area divided by the Total Number of Perforations (Line 7). 4.0 0.37 0.83 1.13 1.47 <br /> 5.0` 0.41 0.93 1.26 1.65 <br /> with <br /> 630 ft2 63 perforations = 10.0 ft2/perforations 'foot Perforations 3/16 inch to 11a inch <br /> Dwellings with 118 inch perforations <br /> 2 feet Other establishments and 1r5T5 with 3/16 <br /> 9. Select Minimum Average Head: 1.0 ft inch to 1/4 Inch perforations <br /> 5 feet Other establishments and hr5T5 with 1/8 inch <br /> perforations <br /> 10. Select Perforation Discharge (GPM)based on Table III: 0.56 GPM per Perforation <br /> 11. Determine required Flow Rate by multiplying the Total Number of Perforations (Line 7)by the Perforation Discharge (Line 10). <br /> 63 Perforations X 0.56 GPM per Perforation = 36 GPM <br />
The URL can be used to link to this page
Your browser does not support the video tag.