Laserfiche WebLink
CITY OF ORONO SEPTIC SYSTEM PERMIT INSTRUCTIONS <br /> The City of Orono Community Development Department requires all septic system installations, <br /> modifications or repairs to obtain a permit. All dwellings that are not connected to municipal or a <br /> central sewer system must be connected to an Individual Septic Treatment System (ISTS). This <br /> policy applies to all septic systems in Orono. <br /> 1: The following steps shall be completed to obtain a permit to install an ISTS in Orono: <br /> a. Obtain a complete site evaluation and a completed ISTS design from a licensed <br /> designer (include license #on the application). <br /> b. Obtain and complete an ISTS permit application from the City of Orono <br /> c. Submit a completed application for an ISTS Permit with a complete evaluation and <br /> design to the City of Orono at least three (3) business days before beginning septic <br /> work. <br /> d. The site evaluation and system design should be submitted on forms available from <br /> the U of M Extension Service SSTS Program at: <br /> http.//septic.umn.eduiformsandsheets/bytype/index.htm#design <br /> 2. Upon receiving a complete application with site evaluation and design, the City of Orono <br /> will review the documentation, visit the site to verify soils if required and issue the permit <br /> or ask for additional information. <br /> 3. Once the permit is issued, the installer must contact Metro West at least 48 hours before <br /> the requested inspection and follow up the morning of the install to confirm the time you <br /> will be ready for inspection. Please call Metro West at 763-479-1720 to schedule the <br /> inspection. If you are unable to reach Metro West, please contact Andrew Mack at the <br /> City of Orono at 952-249-4626 or at arnack@ci.orono.rnn.us <br /> 4. Upon completion of installation, the system must be inspected in accordance with MPCA <br /> rules and regulations with the Orono City Code. The inspection must be conducted <br /> before the system is fully covered without exception. The inspector will conduct an <br /> inspection and prepare an as-built report for record. <br /> 5. Upon final completion, inspection and receipt of the inspector's report, an information <br /> packet is mailed to the homeowner. This will include the original permit, the as-built <br /> compliance inspection report and information on how the homeowner can obtain good <br /> septic maintenance information. This information may be obtained from a publication <br /> produced by the U of M Extension Service Wastewater Resources website at: <br /> http://www.extension.umn.edu/distribution/naturalresources/DD6583.html#1. A printed <br /> document of this information is available for review in our City Hall Office. <br /> Septic Permit—Revised 7/8/2014 Page 3 of 3 <br />