My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016 - 00599 - pool- in ground
Orono
>
Property Files
>
Street Address
>
W
>
Willow Hill Drive
>
2300 Willow Hill Dr - 03-117-23-32-0026
>
Permits/Inspections
>
2016 - 00599 - pool- in ground
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:36:50 PM
Creation date
2/12/2020 1:01:18 PM
Metadata
Fields
Template:
x Address Old
House Number
2300
Street Name
Willow Hill
Street Type
Drive
Address
2300 Willow Hill Dr
Document Type
Permits/Inspections
PIN
0311723320026
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Erosion Control Supplemental Information <br /> Final Stabilization will be provided with(seed, sod, etc): A k `rcn"3 <br /> and 6 inches of topsoil will be added/replaced prior to final stabilization. <br /> Concrete Washout: Location of concrete washout <br /> Off site i Indicated on site plans _Other(description): Contained on truck: <br /> Vegetation: Protective fencing will be installed as necessary so as to exclude all fill and equipment <br /> from the drip line or critical root zone,whichever is greater, of all vegetation to be retained. <br /> Yes —Not Applicable _Other(description): <br /> Inspections: An erosion control inspection plan is required for all projects.The inspection <br /> requirements are as follows: <br /> 1) The individual identified as being responsible for implementing the erosion control <br /> plan must routinely inspect the construction site once every seven days during active <br /> construction and within 24 hours after a rainfall event greater than 0.5 inches in 24 <br /> hours. <br /> 2) All inspections and maintenance conducted during construction must be recorded in <br /> writing and these records must be retained with the erosion control plan and made <br /> available at the District's request within 24 hours.Records of each inspection and <br /> maintenance activity shall include: <br /> i. Date and time of inspections; <br /> ii. Name of person conducting inspections; <br /> iii. Findings of inspections, including recommendations for corrective actions; <br /> iv. Corrective actions taken(including dates, times and party completing <br /> maintenance activities);and <br /> v. Date and amount of all rainfall events greater than 0.5 inches in 24 hours. <br /> Provide the following information for the primary individual responsible for implementing the erosion <br /> control plan: p <br /> Name Ai>r76e. �ce7 F S <br /> Organization <br /> Phone S/ Ngo /3 9? Alternate Phoned f 2-?SO -I 241-- <br /> Email f h -pfof5 i!,v1.4 l C.- ' <br /> I certify that I am familiar with the requirements of the MCWD Erosion Control Rule and that the <br /> proposed activity will be conducted in compliance with this rule. <br /> Code <br /> Sign e of App ' ant or Authorized Agent Date <br /> JUN 01 2016 <br /> Approved B : <br />
The URL can be used to link to this page
Your browser does not support the video tag.