Laserfiche WebLink
1411060' . <br /> THE BACA'Y.4RD BUILDER'S BOOR OF OUTDOOR BUILDING PROJECTS <br /> AMP 2X8 JOISTS FASTEN 2X3 LATTICE FRAME <br /> A ` '74".111.1.1111.1!' <br /> � , ASSEMBLE WITH TO OUTSIDE OF POST WITH NO. FASTEN ALL POST <br /> 1 —' 16D GALVANIZED 10 X 2''4"FLATHEAD WOOD HALVES WITH X 3" <br /> 45° /� \ FINISHING NAILS SCREWS,COUNTERSINK. BOLT WITH TE:UTAND <br /> 111�� FLAT WASHER <br /> T-top. <br /> PIERS OCATION <br /> 1 <br /> (TYP) L�, 1 LATTICE A4'-11Wil�1I rl..L 22,x• <br /> 12' / III I 67%°BEVEL -�1�� t <br /> e I'I DETAIL I <br /> l �� �."X "DEEP GROOVE <br /> �� (TYP.) 11(� <br /> link V <br /> A 11 <br /> i �� • OA <br /> ova SECTION <br /> PLAN VIEW FASTEN DECKING WITH 10D .5�� " <br /> ,GALVANIZED FINISHING NAILS <br /> STOP GROOVE <br /> 22'4 2X4 DETAIL 2 1"FROM END <br /> 4X4 KING POST <br /> SEE DETAIL 3 FASTEN WITH NO.10 X 2'/." <br /> FLATHEAD WOOD SCREWS, <br /> FRONT VIEW COUNTERSINK <br /> SEE DETAIL SECTION ,y <br /> 30" 7 / 8 1 � "X 3"BOLT <br /> ///// —, WITH T-NUT AND <br /> = =-, I4/MI�' FLAT WASHER <br /> �ft �► 45� 2" <br /> �\ — 20. 10" <br /> 1 III 4„ ` ;•, �• , .. <br /> 8 2X4 STIFFENER 4._2.. 3 t \ ,` �� <br /> TYPICAL • <br /> \ 4„ <br /> 2X4 RAFTER <br /> i DETAILS HOOK •11111! <br /> 6” 310,. FOR LAMP 16,/, <br /> I TO SUIT 70°' <br /> yam+.--.�.--- RAFTER DOUBLED - x <br /> .:4 F . 2X4 POST <br /> KfiP JOISTS REST ON 12"DIA.X 36"CONCRETE DETAIL 4 <br /> PIER 12"ABOVE GROUND). FASTEN WITH LEAD ANCHOR. <br /> piers. Mark the center of the struc- level of the gazebo's floor depends <br /> ture as well. on your thoroughness during this <br /> Remove the base assembly and step. <br /> dig holes for the piers. The piers Once the final leveling is com- <br /> should be centered under the frameTete bore <br /> p z'/ <br /> -in.-dia. holes in the <br /> at each corner and at the center. Al- piers with a carbide-tipped masonry <br /> low each pier to stand about 2 in. bit to accommodate lead screw an- <br /> above ground level. Now, use a chors. Install the anchors in the <br /> long, straight 2X4 and a carpenter's holes. These will be used with lag <br /> level to level each perimeter pier screws to secure the gazebo to the <br /> with the center pier. To insure ac- piers. <br /> curacy, double-check the level of Reposition the assembled base on <br /> adjacent piers as well. Take your the piers, then drill counterbored °` <br /> time with this job, since the final holes for the lag screws into the top <br /> 270 <br />