My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011 - 00888 - new septic
Orono
>
Property Files
>
Street Address
>
W
>
Willow Drive North
>
1125 Willow Drive North - 28-118-23-41-0002
>
Septic
>
2011 - 00888 - new septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:24:46 PM
Creation date
2/12/2020 9:13:48 AM
Metadata
Fields
Template:
x Address Old
House Number
1125
Street Name
Willow
Street Type
Drive
Street Direction
North
Address
1125 Willow Drive North
Document Type
Septic
PIN
2811823410002
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OSTP Design Summary Worksheet UNIVERSITY <br /> Minnesota Pollution . <br /> Control Agency OF MINNESOTA � `� <br /> Property Owner/Client: William Leskinen <br /> Site Address: 1125 Willow Drive N Orono, MN 55356 <br /> 1. AVERAGE DESIGN FLOW: <br /> A. Design Flow: 600 Gallons Per Day(GPD) Note: The estimated design flow is considered a peak flow rate including a safety <br /> factor.For long term performance,the average daily flow is recommended to be< <br /> B. Septic Tank capacity: 2000 Gallons 60%of this value. <br /> C. Number of Septic Tanks or Compartments: 2 Effluent Screen Er Alarm? Yes <br /> —Type of Soil Treatment and Dispersal Area Type of Distribution <br /> O Trenches 0 Bed 0 Mound 0 Gravity Distribution ®Pressure Distribution-Level 0 Pressure Distribution-Unlevel <br /> O At-Grade 0 Drip Distribution <br /> System Type <br /> 2 Type I 0 Type II 0 Type III ❑Type IV ❑Type V <br /> 2. SITE EVALUATION: <br /> A. Depth to Limiting Layer: 26 inches 2.2 ft <br /> B. Measured Percent Land Slope: 1 4.0 1% 0.0 <br /> C. Soil Texture: Loam Percolation Rate: 4 Minutes per Inch <br /> D. Soil Hydraulic Loading Rate: 0.60 GPD/ft2 E. Contour Loading Rate 12 Gal/ft <br /> 3. DESIGN SUMMARY <br /> Trench Design Summary <br /> Absorption Area ft2 Sidewall Depth in Trench Width in <br /> Total Lineal Feet ft Number of Trenches Maximum Trench Depth in <br /> Bed Design Summary <br /> Absorption Area ft2 Media Below Pipe in Bed Length ft <br /> Bed Width ft Maximum Trench Depth in <br /> Mound Design Summary <br /> Absorption Area 500 ft2 Bed Length 50 ft Bed Width 10.0 ft <br /> Absorption Width 20.0 ft Clean Sand Lift 1.0 ft <br /> Upslope Berm Width 10.0 ft Downslope Berm Width 16.0 ft Endslope Berm Width 10.0 ft <br /> Total System Length 70 ft Total System Width 36 ft <br /> At-Grade Design Summary <br /> Absorption Bed Width ft Absorption Bed Length ft System Height ft <br /> Absorption Bed Area ft2 Upslope Berm Width ft Downslope Berm Width ft <br /> Endslope Berm Width ft System Length ft System Width ft <br />
The URL can be used to link to this page
Your browser does not support the video tag.