Laserfiche WebLink
. 2.SYSTEM IS DA FOR ORONO COPY <br /> BEDROOMS. ANY INCREASE IN NUMBER <br /> OF BEDROOMS INVALIDATES THIS DESIGN. <br /> Joseph Olson D.B.A. <br /> Rusty Olson's--Soil and Percolation Testing <br /> Joseph J. Olson--MPCA License#810 re _ <br /> 11481 Riverview Rd. NE,Hanover,MN 55341 <br /> (763) 498-8779 Fax (763)498-8290 i0,0k. (Ad I ''► <br /> September 09,2010 <br /> William&Denise Leskinen <br /> 1125 Willow Drive N (,5-2 �c; Z �f � <br /> Orono,Hennepin County <br /> This on-site Sewage Treatment System is designed for a Type 1 four-bedroom home in accordance with the <br /> Minnesota Pollution Control Agency Chapter 7080 and local ordinances. <br /> The periodically saturated soils were located at 22-30 inches(mottled soil).Due to the periodically <br /> saturated soils,a pressurized mound system will need to be installed to treat the septic effluent.The bottom <br /> of the treatment area must be located at least 3'above the saturated soils. <br /> All neighboring wells are greater than 100'from proposed treatment areas. ORONrO copy <br /> The soils at a depth of 12"have a percolation rate averaging 4 MPI. <br /> The existing septic tank must be abandoned.Two ;- . !!! 1: .;• _. • . ;, need_to be install----.�, <br /> Option A the supply line goes around the ho Option B the plumbing must be redirected in the basement. 1 <br /> The supply line must be insulated under both driveways. <br /> All new tanks need to be insulated if there is less than two feet of cover over the top of the tanks and a filter <br /> installed on the second tank.Clean outs must be installed on the end of the laterals for maintenance. <br /> A new 1000 gallon lift station must be installed to lift the effluent to the treatment area. The power supply <br /> and switches must be located outside the manhole and pumping chamber in a weatherproof enclosure. A <br /> warning device must be installed with light and sound devices;this is in case of a pump failure.The <br /> manifold and supply line must have back drainage to the pump chamber.The rock and fill materials must <br /> be clean.The sod layer below the entire mounded area must be turned over.Just break up the sod and be <br /> sure not to over work. <br /> Nothing other than gray water,(laundry,showers,etc.) Human water and toilet tissue should be <br /> disposed of into the septic tanks. Garbage disposals are not recommended. Additives must not be <br /> used;they may cause harmful damage to your septic system. It is recommended that you pump the <br /> tank every year for 1 septic tank,every two years for two septic tanks. <br /> Sin erely, <br /> Joseph J.Olson CITY OF OR NO <br /> SEPTIC PE MIT EVTp . <br /> 1NSPEC R <br /> DATE ,�(r I 'ERMIT NO. <br /> E 'kvv[n ns SI H'.11 i I1I) <br /> ORONO COPY 1. l n .'I<< ��� I� Id nti� i <br /> i I�,�s r <br /> .LS I'LA SL U.\ Sfll .�l : I vi <br />