My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011 - 00888 - new septic
Orono
>
Property Files
>
Street Address
>
W
>
Willow Drive North
>
1125 Willow Drive North - 28-118-23-41-0002
>
Septic
>
2011 - 00888 - new septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:24:46 PM
Creation date
2/12/2020 9:13:48 AM
Metadata
Fields
Template:
x Address Old
House Number
1125
Street Name
Willow
Street Type
Drive
Street Direction
North
Address
1125 Willow Drive North
Document Type
Septic
PIN
2811823410002
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OSTP Pressure Distribution <br /> UNIVERSITY . r. <br /> ,te <br /> Minnesota Polluln Desgn Worksheet OF MINNESOTA -, ; <br /> Control Agency <br /> 1. Select Number of Perforated Laterals in system/zone: 3 Geoteatile n <br /> ��pi� §�gglapO D�pBCjr g }Minimum G-i if 1pg <br /> (2 feet is minimum and 3 feet is maximum spacing) l^"„Perforations spaced 3yapart° q it z'of rocks s ter`i'asze � <br /> 2. Select Perforation Spacing: '` '` '`�' <br /> f P g' 3.0 ft :ta 1 '+ . 1,` `, roc , iz ' <br /> + � + , 9 of rock ti;":+ •+ _�} i!1 l�+�4 <br /> + + + <br /> 3. Select Perforation Diameter Size 1/4 inch Perforation sizing' l+ <br /> 1."to' ' <br /> Perforation spacing:2'to 3' <br /> 4. Length of Laterals =Media Bed Length-2 Feet. Perforation can not be closer then 1 foot from edge. <br /> 50 - 2ft = 48 ft <br /> 5. Determine the Number of Perforation Spaces. Divide the Length of Laterals (Line 4)by the Perforation Spacing (Line 2)and <br /> round down to the nearest whole number. <br /> Number of Perforation Spaces = 48 ft 3 ft = 16 Spaces <br /> 6. Number of Perforations per Lateral is equal to 1.0 plus the Number of Perforation Spaces (Line 5). <br /> Perforations Per Lateral = 16 Spaces + 1 = 17 Perfs. Per Lateral <br /> Check Table I to verify the number of perforations per lateral guarantees less than a 10%discharge variation. The value is double if <br /> the a center manifold is used. <br /> 7. Total Number of Perforations equals the Number of Perforations per Lateral (Line 6)multiplied by the Number of <br /> Perforated Laterals (Line 1). <br /> 17 Perf. Per Lateral X 3 Number of Perf. Laterals = 51 Total Number of Perf. <br /> 8. Calculate the Square Feet per Perforation. Recommended value is 4-10 ft 2 per perforation. <br /> Perforation Discharge(GPM) <br /> Does not apply to At-Grades Perforation Diameter <br /> Head(ft) <br /> Bed Area = Bed Width(ft)X Bed Length (ft) v. ',,, ri„ v. <br /> 1.0' 0.18 0.41 0.56 0.74 <br /> 10 ft X 50 ft = 500 ft2 1.5 0.22 0.51 0.69 0.9 <br /> 2.0° 0.26 0.59 0.80 1.04 <br /> 25 0.29 0.65 0.89 1.17 <br /> Square Foot per Perforation =Bed Area divided by the Total Number of Perforations (Line 7). 3.0 0.32 0.72 0.98 1.28 <br /> $. 0.37 0.83 1.13 1.47 <br /> 3 <br /> 500 ft2 = 51 perforations = 9.8 ft2/perforations 15 foot 0.41 llh i f.r6 ,.65 <br /> 1/a Inch and 3/76 inch perforations on <br /> dwellings <br /> 1fe. <br /> 9. Select Minimum Average Head: 1.0 ftestablishmentsInch <br /> perforations <br /> 2 feet ootheerrestablishmmon dwellings and for <br /> lzhents <br /> 1/4 inch and 3/16 Inch peforations on MSTS <br /> 5 feet 1/8 inch perforations on MSTS <br /> 10. Select Perforation Discharge (GPM) based on Table III: 0.74 GPM per Perforation <br /> 11. Determine required Flow Rate by multiplying the Total Number of Perforations (Line 7)by the Perforation Discharge (Line 10). <br /> 51 Perforations X 0.74 GPM per Perforation = 38 GPM <br /> 12. Select Type of Manifold Connection (End or Center): ID End ❑Center <br />
The URL can be used to link to this page
Your browser does not support the video tag.