Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
City of Orono <br /> Zoning Permit Application'/ <br /> � T Mailing Address.' Permit number. o2D/L —d 0 g 5.3 <br /> sLo V PO Box 66 Date received: O '7- y <br /> Crystal Bay, MN 55323-0066 <br /> Escrow#and ( � �cye J A <br /> Street Address. amount: w I�Cf�IL <br /> y ,, 2750 Kelley Parkway Permit Fee: <br /> � Orono, MN 55356 <br /> 'OIL <br /> �G Approved by: <br /> gkESH�� Fax: 952-249-4616 Notes: <br /> Main: 952-249-4600 www.ci.orono.mn.us <br /> This application form must be completed in full and all required information must be submitted. (Please print.) <br /> Job Site Address: /1 A/ h), floi, 1 L fruit- 44,f, 55 J <br /> CONTRACTOR I APPLICANT INFORMATION: <br /> Name: -n%3-c_ L ,S kt tie-.r- <br /> Phone. 611-PtL-tqs 1/ Fax. <br /> Address: City: ZIP: <br /> Goiltact Parson. Contacts phone number <br /> Email Applicant is: Contractor Homeowner (circle one) <br /> PROPERTY OWNE&NFORMATION: <br /> Name: 1 _-e_4,1 L-.c s1 <-- <br /> Phone(day). (,7(a- Fci c ,Pi S 3. <br /> Mailing Address: //z 5 N iv/ii„z.- /3„..c._. L cif Lw% ,,vtA.I ZIP: 553.5 p, <br /> Email and/or Fax 01zri:s4.i0 A K•,-,,.,. E-' 9 ;.r/, cv - <br /> Overall Project Description: bfa fy) ex%3 t;%,y 7,„,i,,-/' d',..,be ,,,._./ <br /> Check TYPE OF PERMIT COSTBox <br /> '` <br /> Dock,Commercial $50+engineering review costs <br /> Escrow for erosion control and engineering review costs $2,000 <br /> Dock, Residential-Permanent dock on any lake or initial seasonal dock not $50+engineering review costs <br /> on Lake Minnetonka(permanent dock requires CUP) <br /> Hardcover Permit: Driveway, Patio, Sidewalk, Etc.(New or Replacement) No charge <br /> I Also requires is a Minor or Major <br /> Land Alteration Permit <br /> Land Alteration, Major(grading,filling, or excavating)more 500 cubic yards $50 I <br /> or more than 10 cubic yards in lakeshore setback (also requires CUP) <br /> Escrow for erosion control and engineering review costs As determined by CUP <br /> v.,-_ Land Alteration, Minor(grading,filling or excavating)-500 or less cubic $50+engineering review costs <br /> :„ yards o ll�tside of lakeshore setback or less than 10 yards in lakeshore setback <br /> Escrow for erosion control and engineering review costs $2,000 <br /> Retaining Wall measuring under four feet require a zoning permit. $50+engineering review costs <br /> Retaining walls measuring more than four feet(from bottom of footings to top <br /> of wall) require a building permit. (Tiered retaining walls are considered one <br /> wall unless the walls are separated by twice the height of the lower wall.) <br /> Escrow for erosion control and engineering review costs $2,500 <br /> Stairway or Lifts to Lake(New or Replacement) $50+engineering review costs <br /> Escrow for erosion control and engineering review costs $2,000 <br /> Structure Permit for other structures not requiring a building permit but $50+engineering review costs <br /> regulated by the zoning code(including, but not limited to accessory building <br /> of less than 120 square feet, detached deck or platform and sport court) <br /> Escrow for erosion control and engineering review costs $2,500 <br /> Tree Removal or other vegetation removal in 0 to 75 foot zone No charge. Pre-inspection required. <br /> Temporary Construction Office/Trailer(associated with building permit) $30 <br /> (over) <br /> *Permit fee will be collected when the permit is issued. <br /> Updated: January 2014 <br />