My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008 - 00069 - new septic
Orono
>
Property Files
>
Street Address
>
W
>
Willow Drive North
>
1020 Willow Dr N - 27-118-23-32-0022
>
Septic
>
2008 - 00069 - new septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:20:38 PM
Creation date
2/12/2020 9:03:15 AM
Metadata
Fields
Template:
x Address Old
House Number
1020
Street Name
Willow
Street Type
Drive
Street Direction
North
Address
1020 Willow Drive North
Document Type
Septic
PIN
2711823320022
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E-19 <br /> Distribution pipes used for pressure distribution must be constructed of Pressure Fittings <br /> sound and durable material not subject to corrosion, decay, or loss of are Important <br /> strength under continuously wet conditions. All pipes and associated <br /> fittings used for pressure distribution must be properly joined together. <br /> he pipe and connections must be able to withstand a pressure of at <br /> least 40 pounds per square inch. . <br /> The perforated pipe laterals should be connected to a 2-inch diameter 2" diameter <br /> manifold pipe and should have ends capped. The laterals should be manifold for all <br /> spaced no further than 40 inches on center and no further than 20 mounds <br /> inches from the edge of the rock. <br /> The manifold pipe should be connected to the supply pipe from the <br /> pump and should be sloped toward the supply pipe from the pump. At <br /> least 2 inches of rock should be placed over the distribution pipes. <br /> Perforated Laterals <br /> • <br /> Figure E-18 shows a layout of perforated laterals ou rovide 1pr tlure <br /> distribution of effluent over the rock layer of a g <br /> of <br /> the perforated lateral is measured from the point where the effluent <br /> enters to the end cap. All connections in the pressure distribution <br /> system must be tight in order to prevent leakage and to withstand <br /> pressure. 40 <br /> E LAYOUT OF <br /> DISTRIBUTIONTED PIPE LATERALS FOR <br /> IN MOUND <br /> PERFORATED PLASTIC PIPE <br /> -- <br /> . PERFORATIONS SPACE la '�=""^tg fDOr�ON <br /> ON CENTER. PfRFORAT • • x p <br /> V I EEDW ci v BE /is: />z 16 <br /> `e 2 MANIFOLD <br /> PIPE <br /> •� PERFORATIONS ON BOTTOM OF ,,-�"%� <br /> PLASTIC PIPE -- <br /> / <br /> / / r---- PIPE FROM PUMA <br /> / :, <br /> END CAP 1O �L, 1 JL'iTEga� � . <br /> ✓,Q D <br /> "r°RA1 E PUMP NG Cho MBER <br /> OF P <br /> LOG, /5o , <br /> igure -1 S <br /> (AI/� I1tx& S 3c,1 1 <br /> CL <br />
The URL can be used to link to this page
Your browser does not support the video tag.