Laserfiche WebLink
ORONU <br /> COPY <br /> Schedule of repairs and renovations: <br /> 1. Upper bathroom: <br /> A. Move center wall (south) two feet to the south. <br /> B. Install new insulation and sheetrock. <br /> C. Install new tub, stool and sinks. <br /> D. Install an exhaust fan, new lights and a GFI outlet. <br /> 2. Upper hallway: <br /> A. Install new insulation in exterior walls. <br /> B. Install new sheetrock, walls and ceiling. <br /> 3. Living room: <br /> A. Install new insulation in exterior walls. <br /> B. Install new sheetrock, walls and ceiling. <br /> C. Install 1 new electrical duplex outlet and recessed lighting. <br /> 4. Dining room: <br /> A. Install new sheetrock on ceiling. <br /> B. Move existing light location. <br /> 5. Kitchen: <br /> A. Install new counter top and sink. <br /> B. Install new recessed lights. <br /> 6. Half-bathroom: <br /> A. Install new insulation in exterior walls. <br /> B. Install new sheetrock, walls and ceiling. <br /> 7. Lower family room: <br /> A. Install new wall studs on west and south walls. <br /> B. Install new insulation in exterior walls. <br /> C. Install new sheetrock, walls and ceiling. <br /> D. Install new recessed lights and duplex outlets. <br />