Laserfiche WebLink
4. Long Lake agrees that it will provide 350 units of sewer capacity to serve other <br /> properties in Orono as and when the properties connect to the sewer line. The properties that <br /> connect to this sewer line will be treated in the same way as other properties in Orono that have <br /> connected to Long Lake sewer lines. Long Lake will charge a connection fee of$3,450 per unit, <br /> which includes a Metro SAC charge of$1,200, to connect to the sewer system. This fee is <br /> consistent with the 2002 Fee Schedule as adopted by the City Council. The Orono properties that <br /> connect to the Long Lake sewer line will not pay any other one-time or on-going fees. Long <br /> Lake will receive a credit from the MCES for the sewer flow from the Orono properties, and <br /> Orono will be charged by MCES for this flow. Orono shall be responsible for maintenance of all <br /> of the laterals and service taps and Long Lake shall be responsible for the maintenance of the <br /> primary system. <br /> 5. The Minnesota Department of Transportation has agreed to pay the full cost of <br /> constructing a water line to serve the fire station. The water line will cross the Parcel <br /> approximately as shown by Exhibit A. The Parties agree that the waterline is available to serve <br /> the outlot on the parcel as shown on Exhibit A. Long Lake will charge a connection fee of <br /> $2,700 per unit for residential properties to connect to the water system. This fee is consistent <br /> with the 2002 Fee Schedule as adopted by the City Council. Long Lake agrees to provide water <br /> service to this lot and charge a quarterly water service fee consistent with the rates established by <br /> the City Council for properties outside of the City of Long Lake. Long Lake also agrees that if <br /> there is sufficient capacity in the Long Lake water system, and water service is requested, water <br /> service will be made available to the properties in Orono on the east side of Willow Drive <br /> between Watertown Road and the new Highway 12, to the properties in the Hackberry <br /> neighborhood that currently receive sewer service through Long Lake, and to the properties on <br /> Woodhaven Drive. These properties would be charged a connection fee and quarterly water <br /> service fee consistent with the Fee Schedule as adopted by the Long Lake City Council at the <br /> time of the connection. Long Lake shall meter water service with a large capacity main line <br /> meter. Orono shall be responsible for maintenance of all of the laterals and service taps and <br /> Long Lake shall be responsible for the maintenance of the primary system. <br /> 6. The Parties agree that the Parcel has been platted as shown in Exhibit A, and that <br /> the outlot will be under the sole ownership and control of the city of Orono. The Parties agree <br /> that the fire station sits on approximately 2.04 acres of land as shown by the plat, that the right of <br /> way for the public road serving the fire station is approximately .42 acres, and that the wetland <br /> mitigation area and storm water ponding area provided for the fire station is approximately .68 <br /> acres. The Parties agree that this configuration is consistent with the Agreement of August 8, <br /> 2001, in which the Parties determined that the fire station site will be "approximately three <br /> acres." <br /> HC26DS4/4707/26554974.vl 2/26/2002 Page 2 of 3 <br />