My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001 - P04698 - demo
Orono
>
Property Files
>
Street Address
>
W
>
Willow Drive North
>
0340 Willow Dr N - 34-118-23-32-0040 (Orono Fire Station)
>
Permits/Inspections
>
2001 - P04698 - demo
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:56:30 PM
Creation date
2/11/2020 12:17:52 PM
Metadata
Fields
Template:
x Address Old
Address
0340 Willow Dr N
Document Type
Permits/Inspections
PIN
3411823320040
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 �� b <br /> CITY OF ORONO APPLICATION FOR DEMOLITION PERMIT <br /> P.O. Box 66 (2750 Kelley Parkway) <br /> Crystal Bay, MN 55323 <br /> SPECIAL CONDITIONS & HOLD HARMLESS AGREEMENT <br /> General Instructions <br /> 1. You may be required to obtain other permits, i.e. well abandonmment, etc. <br /> 2. Work must not begin unless the permit card is available on the job site. <br /> 3. A 24 hour notice is required for all inspections. Call (612) 249-4600. <br /> JOB SITE ADDRESS: --3) <br /> L147' I/ o r ' v t 4.70 r 74- <br /> Occupancy Type: Residential Commercial <br /> G re y. Gu'Al A <br /> OWNER'S NAME: C ' .11 c F oro - o Phone: 9 s 2 Q y 9- Y6 21 <br /> Mailing Address: City: <br /> CONTRACTOR'S NAME: /re ex e_ Bus.No.: 76 ?- 5 v <br /> Mailing Address: Y 3s Pe l^ r, n a ••c_ y City: C r y .r f h / <br /> sc <br /> Demolition if planned by means of: manual disassembly <br /> 7 <br /> k heavy equipment <br /> Permits Issued: <br /> Well Abandonment <br /> In return for issuance of said Demolition Permit, the undersigned owner hereby agrees as follows: <br /> 1. The structure(s) shall be kept enclosed and/or secured until such time as demolition is <br /> complete. <br /> 2. Demolition debris will be kept off adjoining property and/or the public rights-of-way unless <br /> specific prior approval is obtained in writing for temporary use thereof <br /> 3. Foundations shall be completely removed from the ground. <br /> 4. All demolition debris shall be completely disposed of off site in accordance with all <br /> applicable PCA requirements. <br /> 5. Water wells must be abandoned in accordance with State Health Department regulations. <br /> 6. Inspection required when all debris has been removed, before backfilling. <br />
The URL can be used to link to this page
Your browser does not support the video tag.