My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-P07407 - mechanical
Orono
>
Property Files
>
Street Address
>
W
>
Willow Drive North
>
1180 Willow Dr N - 27-118-23-32-0003
>
Permits/Inspections
>
2004-P07407 - mechanical
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:20:02 PM
Creation date
2/11/2020 11:28:22 AM
Metadata
Fields
Template:
x Address Old
House Number
1180
Street Name
Willow
Street Type
Drive
Street Direction
North
Address
1180 Willow Drive North
Document Type
Permits/Inspections
PIN
2711823320003
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Apr-20-2004 09:I0zm From-CITY OF ORONO +9522494616 7-092 P.002/006 F-906 <br /> CITY OF ORONO APPLICATION FOR MECHANICAL PERMIT <br /> Box 66 (2750 Kelley Parkway) <br /> Crystal Bay,MN 55323 <br /> GENERAI.INF R_ TION <br /> 1. You may apply for mechanical permits by mail or in person at the City offices.Applications will be <br /> reviewed and a permit will be issued within two working days. <br /> 2. Permit cards will be sent by return mail after a review is completed.PERIIETS ARE NOT'VALID <br /> UNTIL YOU RECEIVE A PERMIT,WORK MUST NOT BEGIN UNTIL THE PERMIT CARD IS <br /> POSTED ON THE TOB SITE, -� <br /> 3. Meehaaical Designs-Complete calculations,details,and specifications are required for each heating, <br /> ventilation,,humidification-dehumidification,and air conditioning installation including heat loss/heat <br /> gain calculation,design temperatures,equipment ratings and identification as to type,manufacturer and <br /> model.Data shall be presented on form provided.Identification of and specifications for water heating <br /> equipment shall also be provided. <br /> 4. When any new construction or remodeling is involved,a separate building permit must be obtained. <br /> 5. All work must be done in accordance with the Uniform Mechanical Code/State Building Code <br /> requirements. <br /> 6. All work must be inspected(rough-in and final).Call(952)249-4600.24-hour notice required. <br /> 7. House Heating Test Record must be submitted before final. <br /> Instructions <br /> Complete all items on this application. Compute the permit fee. Sign and date the certification. <br /> INCOMPLETE APPLICATIONS WILL NOT BE PROCESSED.If you have questions,call <br /> (952) 249-4600. <br /> Please check one: ❑New X Addition ❑ Repair ❑Replace❑Residential ❑Commercial <br /> JOB SITE: 1180 Willow Dr N. zip: 55356 <br /> Owner's Name: - Jc a �'he. Phone Number: 952-47s-180p <br /> Mailing Address:1 3 a W-Ile._ f3r City: Orono Zip: 55-1 _ <br /> Cootr-actor's Name:-As pen t <br /> YPn ; l at;on Phone 'umber:_763-498-7053 <br /> Mailing Address: _ & Heating Co. City:_Greenfield Zip: rS-tr� <br /> 9815 Pioneer Trail <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.