My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1995-006952 - remodel
Orono
>
Property Files
>
Street Address
>
W
>
Wayzata Boulevard West
>
3580 Wayzata Boulevard West - 32-118-23-12-0001 -Lurton Park
>
Permits/Inspections
>
1995-006952 - remodel
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:39:10 PM
Creation date
2/10/2020 1:03:06 PM
Metadata
Fields
Template:
x Address Old
House Number
3580
Street Name
Wayzata
Street Type
Boulevard
Street Direction
West
Address
3580 Wayzata Boulevard West
Document Type
Permits/Inspections
PIN
3211823120001
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br /> -four southern windows in living room <br /> -two eastern windows in the sunroom <br /> -three southern windows in the sunroom <br /> -two western windows in the sunroom <br /> -four windows in the western study <br /> -one little window at the bathroom <br /> -the two eastern windows , and the two southern windows in the bedrooms upstairs will need <br /> to be replaced completely with two crank-out style Egress casements. <br /> -will be completely replaced with two crank-out style casement style Egress windows as well. <br /> -Gutter Work; <br /> -furnish and install complete aluminum gutter and downspouts for the home <br /> 3. Barn Remodeling: <br /> -it is the intention of the customer that only minor repairs to get the barn sealed up and <br /> painted be done at this time. <br /> East Wall: <br /> -temporarily support the floor and wall above and "cut" out the rotted bottom plate of the <br /> wall and portions of the rotted studs, slipping in a new 6" by 6" treated beam plate and <br /> renailing the studs and beams <br /> South Gable End Wall; <br /> -rebuild the wall area caved in by a tractor, reusing the existing materials and treated <br /> materials for the balance of the framing. <br /> North Wall; <br /> no work in the base bid <br /> West wall: <br /> no work in the base bid <br /> Interior; <br /> -resupport missing or rotted beams for the main floor level. <br /> -it is assumed that the original materials would be reused as much as possible. <br /> -it is planned that the main floor will be nailed where the boards are loose and open cavities <br /> will be barred with additional lumber for protection. <br /> -Foundation: No Foundation repair planned at this time <br /> -Roofing: <br /> -Tear off the existing two layers of roofing. Install a layer of 1/2" CDX three ply <br /> plywood over the entire roof area. Furnish and install Certainteed Sealdon 25, 235#, 25 <br /> year asphalt three tab shingles. To include a ridge vent that will be hidden by shingles. <br /> Siding: Replace some damaged siding <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.