Otto G.Bonestroo,PE. Howard A.Sanford,P.E. Agnes M.Ring,A.I.C.P Miles B.Jensen,PE.
<br /> Robert W.
<br /> lip Gravel,
<br /> E.
<br /> Bonestroo Joseph C Andelik,RE Robert R.Pfeffede,PRE. Thomas W.Peterson,P.E. Karen L.Wemeri,P.E.
<br /> Rosene Marvin L.Sorvala,P.E. Richard W.Foster,P.E. Michael C.Lynch,P.E. Gary D.Kristofitz,P.E.
<br /> Richard E.Turner,P.E. David O.Loskota,P.E. James R.Maland,P.E. F Todd Foster,PE.
<br /> MEM Glenn R.Cook,
<br /> Anderlik & Thomas E
<br /> E.Noyes,RE. Jerry A.Bourdon, tt PE. Robert C.Russek, Sc J.A A.I.A.ganek,P.E. Do.Pertzsch,RE. luglas J.Benoit,P.E.
<br /> Robert G.Schunicht,P.E. Mark A.Hanson,P.E. Kenneth P Anderson,PE. Shawn D.Gustafson,P.E.
<br /> Associates Susan M.Eberlin,C.PA. Michael T Rautmann,PE. Mark R.Rolfs,PE. Cecilio Olivier,P.E.
<br /> 'Senior Consultant Ted K.Field,P.E. Mark A.Seip,P.E. Paul G.Heuer,P.E.
<br /> Thomas R.Anderson,A.I.A. Gary W Morien,P.E. John P Gorder,P.E.
<br /> Engineers & Architects Donald C.Burgardt,P.E. Daniel J.Edgerton,PE. Charles A.Erickson
<br /> Thomas E.Angus,P.E. A.Rick Schmidt,P.E. Leo M.Pawelsky
<br /> Ismael Martinez,P.E. Philip J.Caswell,P.E. Harlan M.Olson
<br /> October 13, 1993 Michael P Rau,P.E. Mark D.Wallis,P.E. James E Engelhardt
<br /> Mr. Lyle Oman, Building Official
<br /> City of Orono
<br /> Post Office Box 66
<br /> Crystal Bay, Minnesota 55323
<br /> Re: D. Brian Fulmer Sewer Plan
<br /> File No. 139Gen
<br /> Dear Lyle,
<br /> We have reviewed the proposed sewer plan submitted for the D. Brian Fulmer property
<br /> located at the southeast corner of U.S. Highway No. 12 and the Burlington Northern
<br /> Railroad, in the Northeast Quarter of Section 32. We would recommend the following
<br /> modifications.
<br /> The pump should be designed for a Total Design Head (TDH) of 115 feet. This allows
<br /> for the static head when MWCC's Maple Plain Lift Station is pumping (1079 - 967 =
<br /> 112 feet) and approximately 3 feet of head losses due to the 2" forcemain, check valve
<br /> and gate valve. The developer's engineer should check with the pump manufacturer
<br /> (Aurora/Hydromatic Pumps, Inc.) to determine of the motor will be overloaded if it is
<br /> pumping against a lesser head. For example, if the MWCC station is pumping at 1150
<br /> GPM or if it is not operating. The proposed lift station wet well depth should be a
<br /> minimum of 2' below the inlet pipe and 3' below the discharge pipe as shown on the
<br /> enclosed manufacturer's detail. The developer's engineer should check with the MWCC
<br /> regarding their tap connection requirements and should complete an "Application and
<br /> Permit for Connection to, or use of, Metropolitan Waste Control Commission Facilities".
<br /> Please contact me at this office if you have any questions regarding this matter.
<br /> Yours very truly,
<br /> BONESTROO, ROSENE, ANDERLIK & ASSOCIATES, INC.
<br /> J" b - )d�
<br /> Shawn D. Gustafson, P.E.
<br /> cc: Ms. Jeanne A. Mabusth,
<br /> Building and Zoning Administrator
<br /> Enclosure
<br /> 2335 West Highway 36 • St. Paul, MN 55113 9 612-636-4600
<br />
|