My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Responsible for costs before permit can be issued
Orono
>
Property Files
>
Street Address
>
W
>
Wayzata Boulevard West
>
3507 Wayzata Boulevard West - 32-118-23-13-0001
>
Correspondence
>
Responsible for costs before permit can be issued
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:39:16 PM
Creation date
2/10/2020 12:46:36 PM
Metadata
Fields
Template:
x Address Old
House Number
3507
Street Name
Wayzata
Street Type
Boulevard
Street Direction
West
Address
3507 Wayzata Boulevard West
Document Type
Correspondence
PIN
3211823130001
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
o � o <br /> CITY of ORONO <br /> ��� ✓ Municipal Offices <br /> �L ► �� Street Address: Mailing Address: <br /> 9kES 0 2150 Kelley Parkway P.O. Box 66 <br /> Orono, MN 55356 Crystal Bay, MN 55323.0066 <br /> December 14, 1993 <br /> Mr. D. Brian Fulmer <br /> 3507 Wayzata Boulevard <br /> Long Lake, MN 55356 <br /> Dear Mr. Fulmer: <br /> Due to a failing septic system at your dog kennel facility, the City Council on December 8, 1986 <br /> granted a variance for you to hook up to the sewer line located at the southeast corner of US <br /> Highway 12 and the Burlington Northern Railroad pending Metropolitan Council approval. The <br /> City acquired the Met Council's approval in 1987, but the sewer hook up has still not been <br /> completed after six years. <br /> The septic system has been discharging sewage effluent to the surface posing a threat to the <br /> health and welfare of the residents of the City. The sewer hook up is required now to eliminate <br /> the sewage discharge before any serious health problems result. <br /> Engineering was approved for your lift station and connection to the sewer line October 13, <br /> 1993. You have been contacted on several occasions to verify your progress in making the <br /> connection to the sewer line. At this time, connection has not been made nor has a permit been <br /> issued for the required work. In order to expedite your connection to the sewer and <br /> abandonment of your septic system, you are required to obtain a permit for connection to sewer <br /> by January 5, 1994 with the sewer connection and septic system abandonment to be completed <br /> by January 31, 1994. If these deadlines are not met, we will be forced to turn this matter over <br /> to the City Attorney. <br /> Please contact me at the City offices if there are any questions. Thank you for your <br /> cooperation. <br /> Sincerely, <br /> D' <br /> Step en Weckman <br /> On-Site Systems Manager <br /> SW/lsv <br /> Telephone (612) 473-7357 FAX 473-0510 <br />
The URL can be used to link to this page
Your browser does not support the video tag.