Laserfiche WebLink
Otto G.Bonestroo,P.E. Howard A.Sanford,P.E. Agnes M.Ring.A.I.C.P. Miles B.Jensen.P.E. <br /> Bonestroo Robert W Rosen.PE' Keith A.Gordon.P.E. Philip J.Pyne,P.E. L.Phillip Gravel,P.E. <br /> Joseph C.Anderlik.P.E. Robert R.PfeRerle,P.E. Thomas W Peterson,P.E. Karen L.Wiemed,P.E. <br /> Rosen Marvin L.Sorvala,P.E. Richard W Foster,P.E. Michael C.Lynch.P.E. Gary D.Kristolltz,P.E. <br /> Richard E.Turner,P.E. David O.Loskota.P.E. James R.Maland,P.E. F Todd Foster P.E. <br /> Glenn R. <br /> ert C,Russek,A.I.A. Jerry <br /> .Pertzsch,RE. Keith R. <br /> Anderlik & Thomas E.Noyes.RE. JerrJerry A.Bourdon.RE. Scott D gaanek,P.E. Douglas J.Benoit,P.E. <br /> Robert G.Schunicht.P.E. Mark A.Hanson.P.E. Kenneth P.Anderson,P.E. Shawn D.Gustafson.P.E. <br /> Associates Susan M.Ebedin,C.P.A. Michael T.Rautmann.P.E. Mark R.Rolls.PE. Cecilio Olivier.P.E. <br /> *Senior Consultant Ted K.FW.P.E. Mark A.Seip,PE. Paul G.Heuer,P.E. <br /> Thomas R.Anderson,A.I.A. Gary W Morien,P.E. John P Gorder.P.E. <br /> Engineers & Architects Donald C.Burgardt,PE. Daniel J.Edgerton,P.E. Charles A.Erickson <br /> Thomas E.Angus.PE. A.Rick Schmidt,P.E. Leo M.Pawelsky <br /> Ismael Martinez.P.E. Philip J.Caswell,P.E. Harlan M.Olson <br /> October 13, 1993 Michael P Rau.PE. Mark D.Wallis,P.E. James F Engelhardt <br /> Mr. Lyle Oman, Building Official <br /> City of Orono <br /> Post Office Box 66 <br /> Crystal Bay, Minnesota 55323 <br /> Re: D. Brian Fulmer Sewer Plan <br /> File No. 139Gen <br /> Dear Lyle, <br /> We have reviewed the proposed sewer plan submitted for the D. Brian Fulmer property <br /> located at the southeast corner of U.S. Highway No. 12 and the Burlington Northern <br /> Railroad, in the Northeast Quarter of Section 32. We would recommend the following <br /> modifications. <br /> The pump should be designed for a Total Design Head (TDH) of 115 feet. This allows <br /> for the static head when MWCC's Maple Plain Lift Station is pumping (1079 - 967 = <br /> 112 feet) and approximately 3 feet of head losses due to the 2" forcemain, check valve <br /> and gate valve. The developer's engineer should check with the pump manufacturer <br /> (Aurora/Hydromatic Pumps, Inc.) to determine of the motor will be overloaded if it is <br /> pumping against a lesser head. For example, if the MWCC station is pumping at 1150 <br /> GPM or if it is not operating. The proposed lift station wet well depth should be a <br /> minimum of 2' below the inlet pipe and 3' below the discharge pipe as shown on the <br /> enclosed manufacturer's detail. The developer's engineer should check with the MWCC <br /> regarding their tap connection requirements and should complete an "Application and <br /> Permit for Connection to, or use of, Metropolitan Waste Control Commission Facilities". <br /> Please contact me at this office if you have any questions regarding this matter. <br /> Yours very truly, <br /> BONESTROO, ROSENE, ANDERLIK & ASSOCIATES, INC. <br /> Shawn D. Gustafson, P.E. <br /> cc: Ms. Jeanne A. Mabusth, <br /> Building and Zoning Administrator <br /> Enclosure <br /> 2335 West Highway 36 • St. Paul, MN 55113 • 612-636-4600 <br />